ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 99 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 3. 6kw ac module system. Grid direct, no batteries. Add circuit for monitoring. Date: August 17, 2016 Contractor: Sunergy Systems IncPermit type: Electrical | Permit status: Permit closed | Completion date: September 14, 2016 | Expiration date: August 17, 2017 | Current use: Single family / duplex | Permit id: 6552005 | |||||
SCORE 100 An electrical rough-in will be performed for possible future solar photovoltaic system Date: July 7, 2015 Contractor: Puget Sound Solar LlcPermit type: Electrical | Permit status: Permit closed | Completion date: July 30, 2015 | Expiration date: July 6, 2016 | Current use: Single family / duplex | Permit id: 6483021 | |||||
SCORE 99 An electrical rough-in will be performed for possible future solar photovoltaic system Date: July 7, 2015 Contractor: PugetsoundsolarPermit type: Electrical | Permit status: Permit closed | Completion date: July 30, 2015 | Expiration date: July 6, 2016 | Current use: Single family / duplex | Permit id: 6483021 |