ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 99 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 40a backfeed breaker into main 200a panel. Add circuit for monitoring. Date: October 20, 2015 Contractor: Sunergy Systems IncPermit type: Electrical | Permit status: Permit closed | Completion date: October 23, 2015 | Expiration date: October 19, 2016 | Current use: Single family / duplex | Permit id: 6500751 |