Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 79 On behalf of the district of columbia water and sewer authority (dc water), the dc clean rivers (dccr) project requests the approval to abandon 1 monitoring well with vibrating wire piezometers (sas-205). The well is located adjacent to the listed address, 4401 overlook ave sw. The monitoring well with vibrating wire piezometer was installed by dccr during the investigation and design phase to provide information regarding subsurface conditions. Construction of the tunnel and near surface structures under division a are now complete. Therefore, the wells installed as part of this division are no longer needed and will be abandoned. The monitoring well will be abandoned by either removing the well casing or perforating the well casing in the screened interval and filling the well with a cement bentonite slurry. Monitoring wells will be abandoned following doee regulations. See attached work plan for more details. ![]() ![]() Client: Dc Water Carlton Ray Co Christopher Gerber | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: September 24, 2017 | Permit id: Pa219017 | |||||
SCORE 79 Excavation; boring test pit (single) ![]() ![]() Permit status: 8 | Expiration date: September 24, 2017 | Permit id: Pa219017 | |||||
SCORE 79 On behalf of the district of columbia water and sewer authority (dc water), the dc clean rivers (dccr) project requests the approval to abandon 1 monitoring well with vibrating wire piezometers (sas-205). The well is located adjacent to the listed address, 4401 overlook ave sw. The monitoring well with vibrating wire piezometer was installed by dccr during the investigation and design phase to provide information regarding subsurface conditions. Construction of the tunnel and near surface structures under division a are now complete. Therefore, the wells installed as part of this division are no longer needed and will be abandoned. The monitoring well will be abandoned by either removing the well casing or perforating the well casing in the screened interval and filling the well with a cement bentonite slurry. Monitoring wells will be abandoned following doee regulations. See attached work plan for more details. ![]() ![]() Permit status: Permit expired | Expiration date: September 24, 2017 | Permit id: Pa219017 | |||||
SCORE 99 Construction staging area ![]() ![]() Permit status: Permit expired | Expiration date: September 8, 2017 | Permit id: Pa10454344 |