Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Install 11 replacement windows. Date: February 27, 2015 Value: $9,975 Permit type: Addition/alteration | Completion date: March 16, 2015 | Current use: One-family | Parcel: 26065 | |||||
SCORE 93 Complete demo of existing kids bathroom. Open up closet wall for new double door. Update electrical oulets + wiring. Install new vanity wall light & new vent fan/light combo. Rough in and install new tub, toilet, shower head + valve & sink. Fully insulate all walls, hang blueboard + plaster. Install new floor tile. Finish work + paint walls and ceiling. Complete demo of existing master bathroom. Open up closet wall for new double door. Update electrical oulets + wiring. Install new vanity wall light & new vent fan/light combo. Rough in and install new tub, toilet, shower head + valve & sink. Install new kickspace heater. Fully insulate all walls, hang blueboard + plaster. Install new floor tile. Finish work + paint walls and ceiling. Install new high velocity ac systems along with required ductwork. Low voltage & thermostats installed as well. Insulate existing basement with 5. 5" open cell and existing attic with 10-12" blown-in cellulose. Permit type: Addition/alteration | Completion date: April 17, 2015 | Current use: Two-family | Parcel: 26065 | |||||
SCORE 65 Install 11 replacement windows. Permit type: Addition/alteration | Completion date: March 16, 2015 | Current use: One-family | Permit id: 0 | Parcel: 26065 | |||||
SCORE 93 Complete demo of existing kids bathroom. Open up closet wall for new double door. Update electrical oulets + wiring. Install new vanity wall light & new vent fan light combo. Rough in and install new tub, toilet, shower head + valve & sink. Fully insulate all walls, hang blueboard + plaster. Install new floor tile. Finish work + paint walls and ceiling. Complete demo of existing master bathroom. Open up closet wall for new double door. Update electrical oulets + wiring. Install new vanity wall light & new vent fan light combo. Rough in and install new tub, toilet, shower head + valve & sink. Install new kickspace heater. Fully insulate all walls, hang blueboard + plaster. Install new floor tile. Finish work + paint walls and ceiling. Install new high velocity ac systems along with required ductwork. Low voltage & thermostats installed as well. Insulate existing basement with 5. 5" open cell and existing attic with 10-12" blown-in cellulose. Permit type: Addition/alteration | Completion date: April 17, 2015 | Current use: Two-family | Permit id: 0 | Parcel: 26065 | |||||
SCORE 93 Interior kitchen plaster and paint work. Exterior window replacement to existing framing. Install new construction double kitchen window. Reframe opening. Install weather proofing and window flashing. Permit type: Addition/alteration | Completion date: July 17, 2017 | Current use: One-family | Permit id: 0 | Parcel: 26065 |