Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Jones new mobile Date: June 29, 2009 Permit status: Closed | Permit id: 09-02636 | |||||
SCORE 95 Jones new mobile Client: Jones New Mobile | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-02636 | Parcel: 46786 | |||||
SCORE 99 Jones new mobile Client: Jones New Mobile | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-02636 | Parcel: 46786 | |||||
SCORE 100 Jones new mobile Client: Jones New Mobile | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-02636 | Parcel: 46786 | |||||
June 3, 2009 12:25:43 pm cbeavers. Moving new mobile home into a mobile home park location: patton ave to n lousiana ave, go thru two traffic lights then turn l onto adams hill rd, then r onto coach crest dr, bear l after entering park and site is 3rd lot from the end; june 29, 2009 10:28:02 am alisam. Moving new mobile home into a mobile home park lot 42;aml; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 sq Permit type: Permits - historical | Permit status: Closed | Permit id: 09-02636 | Parcel: 46786 | |||||
Jones new mobile Date: June 29, 2009 Value: $35,000 Permit type: Historical | Permit status: Closed | Permit id: 09-02636 | |||||
June 3, 2009 12:25:43 pm cbeavers. Moving new mobile home into a mobile home park location: patton ave to n lousiana ave, go thru two traffic lights then turn l onto adams hill rd, then r onto coach crest dr, bear l after entering park and site is 3rd lot from the end; june 29, 2009 10:28:02 am alisam. Moving new mobile home into a mobile home park lot 42;aml; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 sq Date: June 29, 2009 Permit type: Permits - historical | Permit status: Closed | Permit id: 09-02636 | Parcel: 46786 |