ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 89 Amend electrical permit number 808893 replace meter socket service entrance cable and add disconnect. Remove electric utility reverse meter Date: November 13, 2017 Contractor: Kiss ElectricClient: Christopher Steven | Permit type: Administrative permit | Permit status: Active | Completion date: November 13, 2017 | Permit id: 823537 | |||||
SCORE 89 Racking and electric installation of 8. 68kw solar system. System consist of 31 jinko model280-60b solar panels. 31 enphase 250kw miroinveters model m250-60-2ll-s22. All pv system components are list for pv solar application per nec 690. 4(d) grounded bonded. Panelboard and disconnect sws labeling details shall be included with plans per 2008 nec (sfd) Date: September 22, 2017 Contractor: Kiss ElectricClient: Christopher Steven | Permit type: Electrical permit | Permit status: Active | Completion date: September 22, 2017 | Permit id: 808893 | |||||
SCORE 59 Legalize a previously constructed one (1) story rear addition to an existing attached structure (size and location as shown on submitted plan). Date: June 30, 2017 Contractor: Christopher Levins ContractinClient: Christopher Steven | Permit type: Zoning permit | Permit status: Completed | Completion date: June 30, 2017 | Permit id: 796232 | |||||
SCORE 59 Removing existing structure addition located on the back elevation of the home. This demo phase includes the existing shed style roof and rafters also the three surrounding walls, next phase using the exsiting foundation frame new walls and roof. See drawing installing the new some amount new windows and 36" exterior doors. Exterior finishes will include nre roofing. Asphalt shingles and underlayment (30lb) metal copping and gutteron the eve. Vinyle sidings and suffet will be installed with tyveil underlayment. Date: June 30, 2017 Contractor: Christopher Levins ContractinClient: Christopher Steven | Permit type: Addition permit | Permit status: Active | Completion date: August 1, 2017 | Permit id: 794010 |