ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 79 A one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 13. 5kw solar pv system on roof, nema plug in garage 04 18 17 cep; contractor transferred from solterra systems to solterra global. 5 26 17 cpg add (1) 2 amp service Date: April 5, 2017 Contractor: Solterra Global LlcPermit type: Electrical | Permit status: Permit closed | Completion date: June 22, 2017 | Expiration date: April 5, 2018 | Current use: Single family / duplex | Permit id: 6590109 |