ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 89 Roof mount residential solar pv for existing sfd with meter upgrade to 125 amps per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 01. 15. 2014: plan change change amp of meter upgrade.. Lhg Date: December 10, 2013 Contractor: Brian MilhollandPermit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: April 23, 2014 | Permit id: Pds2013-Resalt- | |||||
Roof mount residential solar pv for existing sfd with meter upgrade to 125 amps per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 01. 15. 2014 plan change change amp of meter upgrade.. Lhg Date: December 10, 2013Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 23, 2014 | Permit id: Pds2013-Resalt- | |||||
SCORE 96 Roof mount residential solar pv for existing sfd with meter upgrade to 125 amps per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 01. 15. 2014 plan change change amp of meter upgrade.. Lhg Date: December 10, 2013 Contractor: Milholland Electric IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: April 23, 2014 | Permit id: Pds2013-Resalt- | |||||
Final Date: April 22, 2014Permit status: Pass | Permit id: Pds2013-Resalt- |