ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Put dry wall up max ten sheets, replace like in kind plumbing fixtures, repair replace plaster, painting work, cabinets and granite, repair replace in kind electrical fixtures, repair replace damage doors, repair and replace floor in kind, repair replace damage trim, repair replace damage counter. Repair replace permit will be limited. No structural work. Date: April 12, 2012Client: Edna Pahlavani | Applicant: Edna Neda Pahlavani | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1207398 | |||||
Plumbing and gas Date: April 12, 2012Client: Edna Pahlavani | Applicant: Joseph M Magnolia | Permit status: Permit issued | Permit id: P1204479 | |||||
Renovations to existing basement level 1-bedroom apartment changing use of space to dental office as shown on the attached mech. Plumb., elect., demolition, and arch. Dwgs. Interior work only. Change of use in basement only Date: August 29, 2014Client: Ali Nejad Pahlavani | Applicant: John Giuseppe-Ramco | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1410834 | |||||
SCORE 56 Put dry wall up max ten sheets, replace like in kind plumbing fixtures, repair replace plaster, painting work, cabinets and granite, repair replace in kind electrical fixtures, repair replace damage doors, repair and replace floor in kind, repair replace damage trim, repair replace damage counter. Repair replace permit will be limited. No structural work. Date: April 12, 2012 Contractor: Edna Neda PahlavaniClient: Edna Pahlavani | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1207398 | |||||
SCORE 93 Electrical Date: April 18, 2012 Contractor: Joseph A. SemperClient: Ali Nejad Pahlavani | Permit status: Permit issued | Permit id: E1205224 | |||||
SCORE 96 Plumbing and gas Date: April 12, 2012 Contractor: Joseph M MagnoliaClient: Edna Pahlavani | Permit status: Permit issued | Permit id: P1204479 | |||||
SCORE 89 Electrical Date: March 11, 2015 Contractor: Hee HwangClient: Ali Nejad Pahlavani | Permit status: Completed | Permit id: E1503965 | |||||
SCORE 96 Mechanical Date: March 23, 2015 Contractor: Kewal K. KhattaClient: Edna Pahlavani | Permit status: Completed | Permit id: M1501445 | |||||
SCORE 98 Plumbing and gas Date: March 4, 2015 Contractor: Joseph LeeClient: Ali Nejad Pahlavani | Permit status: Permit issued | Permit id: P1503971 | |||||
SCORE 89 Electrical Date: December 18, 2015 Contractor: James W. ChatmanClient: Edna Pahlavani | Permit status: Permit issued | Permit id: E1602239 | |||||
SCORE 96 Plumbing and gas Date: April 12, 2012 Contractor: Joseph M MagnoliaClient: Edna Pahlavani | Permit status: Permit issued | Permit id: P1204479 | |||||
SCORE 93 Electrical Date: April 18, 2012 Contractor: Joseph A. SemperClient: Ali Nejad Pahlavani | Permit status: Permit issued | Permit id: E1205224 | |||||
SCORE 93 Electrical Date: April 18, 2012 Contractor: Joseph A. SemperClient: Ali Nejad Pahlavani | Permit status: Permit issued | Permit id: E1205224 | |||||
SCORE 96 Plumbing and gas Date: April 12, 2012 Contractor: Joseph M MagnoliaClient: Edna Pahlavani | Permit status: Permit issued | Permit id: P1204479 | |||||
SCORE 84 Install the 19 solar panels with the system size of 4. 75 kw of height 1. 8 feet on the roof of building. Date: November 10, 2015 Contractor: Solar SolutionClient: Ali Nejad Pahlavani | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1600755 | |||||
SCORE 89 Electrical Date: December 18, 2015 Contractor: James W. ChatmanClient: Edna Pahlavani | Permit status: Permit issued | Permit id: E1602239 | |||||
SCORE 89 Electrical Date: March 11, 2015 Contractor: Hee HwangClient: Ali Nejad Pahlavani | Permit status: Completed | Permit id: E1503965 | |||||
SCORE 98 Plumbing and gas Date: March 4, 2015 Contractor: Joseph LeeClient: Ali Nejad Pahlavani | Permit status: Permit issued | Permit id: P1503971 | |||||
SCORE 96 Mechanical Date: March 23, 2015 Contractor: Kewal K. KhattaClient: Edna Pahlavani | Permit status: Completed | Permit id: M1501445 | |||||
SCORE 93 Renovations to existing basement level 1-bedroom apartment changing use of space to dental office as shown on the attached mech. Plumb., elect., demolition, and arch. Dwgs. Interior work only. Change of use in basement only Date: August 29, 2014 Contractor: John GiusepperamcoClient: Ali Nejad Pahlavani | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1410834 | |||||
SCORE 56 Adding an electrical sign to front of property. Already have building permit. I also have drawings and plans from a sign company. Date: May 22, 2015 Contractor: None; Pahlavani DentalClient: Pahlavani Dental | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1500268 | |||||
SCORE 56 Placing an ada hadicap lift in back Date: July 27, 2015 Contractor: Edna Pahlavani DentalClient: Edna Pahlavani Dental | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1510312 |