Building Permits at 40 West Marginal Way Sw Seattle WA


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 40 West Marginal Way Sw Seattle WA over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Proposed ssdp exemption, terminal 105, port of seattle, for the purpose of approximately 285 linear feet, bank rehabilitation, including the following: (1) placement of approximately 45 pieces, anchored large-woody debris, land-ward of elevation plus 12 feet mllw; (2) placement of approximately 65 cubic yards, composed soil, land-ward of large-woody-debris; and, (3) installation of native riparian plants land-ward of large-woody-debris.

Applicant: Blomberg, George | Permit type: Construction | Permit status: Initial information colle | Current use: Industrial | Permit id: 6536567
09540 West Marginal Way Sw Seattle Wa
Master use permit for future maintenance dredging of 1,3 cu. Yds. Of sediment for 3 lineal ft. In east duwamish waterway adjacent to terminal 103. Determination of non- significance prepared by the port of seattle.
Date:  February 14, 2007

Applicant: Blomberg, George | Permit type: Sepa threshold determination | Permit status: Permit finaled | Permit id: 3006815
2007/02/1409540 West Marginal Way Sw Seattle Wa
Proposed ssdp exemption, terminal 105, port of seattle, for the purpose of approximately 285 linear feet, bank rehabilitation, including the following: (1) placement of approximately 45 pieces, anchored large-woody debris, land-ward of elevation plus 12 feet mllw; (2) placement of approximately 65 cubic yards, composed soil, land-ward of large-woody-debris; and, (3) installation of native riparian plants land-ward of large-woody-debris.

Applicant: Blomberg, George | Permit type: Construction | Permit status: Initial information colle | Current use: Industrial | Permit id: 6536567
09540 West Marginal Way Sw Seattle Wa
Proposed ssdp exemption, terminal 105, port of seattle, for the purpose of approximately 285 linear feet, bank rehabilitation, including the following: (1) placement of approximately 45 pieces, anchored large-woody debris, land-ward of elevation plus 12 feet mllw; (2) placement of approximately 65 cubic yards, composed soil, land-ward of large-woody-debris; and, (3) installation of native riparian plants land-ward of large-woody-debris.

Applicant: Blomberg, George | Permit type: Construction | Permit status: Initial information colle | Current use: Industrial | Permit id: 6536567
09540 West Marginal Way Sw Seattle Wa
SCORE
95
Construct repairs to existing public access viewing platform dock at terminal 105, per plan.
Date:  February 10, 2016
Value:   $85,000

Applicant: Blomberg, George | Permit type: Construction | Permit status: Application accepted | Expiration date: July 4, 2018 | Current use: Industrial | Permit id: 6514531
2016/02/10850009540 West Marginal Way Sw Seattle WaPort Of Seattle Engineering
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.