Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Roof mount residential solar pv with 225a panel upgrade for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. ![]() ![]() Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: March 27, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 88 Roof mount residential solar pv with 225a panel upgrade for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. ![]() ![]() Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 27, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 93 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. ![]() ![]() Permit type: Addn | Permit status: Completed | Completion date: November 1, 2017 | Permit id: Pds2017-Resalt- | |||||
Final ![]() Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
SCORE 88 Roof mount residential solar pv with 225a panel upgrade for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. ![]() ![]() Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2015-Resalt- | Parcel: 124-462-17-00 | |||||
SCORE 93 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. ![]() ![]() Permit type: Hvac change out | Permit status: Issued | Permit id: Pds2017-Resalt- |