| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 100 Service upgrade, partial rewire Date: November 21, 2016 Contractor: Fountain LightPermit type: Electrical | Permit status: Permit closed | Completion date: December 5, 2016 | Expiration date: November 21, 2017 | Current use: Single family / duplex | Permit id: 6568256 | |||||
SCORE 79 5-1-17 bz note:plan states 7. 25kva system (typo) actually 7. 5kva system as permit states 25modules x 300va =7. 5kva system4-11-17 pv system approved .[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 7. 5kw solar pv system on roof. (25) itek 3 modules, (1) 7. 6kw inverter. 04 18 17 cep; contractor transferred from solterra systems to solterra global. Date: April 5, 2017 Contractor: Solterra Global LlcPermit type: Electrical | Permit status: Permit closed | Completion date: May 4, 2017 | Expiration date: April 5, 2018 | Current use: Single family / duplex | Permit id: 6590086 |