ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Date: February 2, 2004Permit id: 04-01-259 | Parcel: 001010001000 | |||||
Date: January 18, 2005Permit id: 05-01-153 | Parcel: 045190008000 | |||||
Date: September 21, 2009Permit id: 09-09-071 | Parcel: 072053003000 | |||||
Date: May 18, 2010Permit id: 10-05-067 | Parcel: 072053003000 | |||||
Install 1" water meter; new sfd, bridgeway lakes 1 phase 3. Temporary water paid for six months from issuance date. Date: February 4, 2004Permit id: 04-0113 | |||||
Swimming pool:all work shall comply with city standards. An engineering pre-inspection is required! Call 916-617-4692 final engineering encroachment inspection is required prior to building permit final inspection. Any damage to the curb, gutter, sidewalk or landscape will be repaired prior to deposit refund. Date: January 19, 2005Permit id: 05-0058 | Parcel: 045190008000 | |||||
Install 1" water meter; new sfd, bridgeway lakes 1 phase 3. Temporary water paid for six months from issuance date. Date: June 27, 2005Permit id: 05-1003 | |||||
SCORE 100 A pre-inspection is required! Final engineering encroachment inspection is required 24 hrs prior to requesting for building permit final inspection. All work shall comply with city standards. Any damage to the curb, gutter, sidewalk or landscape will be repaired prior to finalization of encroachment permit and deposit refund. Engineering inspection request line (916) 617-4692 inground gunite swimming pool Date: September 21, 2009 Contractor: Premier PoolsPermit id: 09-0268 | Parcel: 072053003000 |