ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 95 Rewire house. Date: January 25, 2015 Contractor: Logan Electric LlcPermit type: Electrical | Permit status: Permit closed | Completion date: April 6, 2015 | Expiration date: January 25, 2016 | Current use: Single family / duplex | Permit id: 6456167 | |||||
SCORE 95 9-6-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 1. Relocating existing service entrance and replacing it with a new 225 amp meter main with a 30-slot external breaker panel (includes a 2 amp main for the house and a 125 amp main for the adu). 2. Installing one dedicated amp breaker for new solar pv system to be installed in the house panel3. Installing a 32 module solar pv array on the house. 08 30 17 cep; add (1) 200amp service. Date: August 15, 2017 Contractor: West Seattle Electric And SolarPermit type: Electrical | Permit status: Permit closed | Completion date: September 29, 2017 | Expiration date: August 15, 2018 | Current use: Single family / duplex | Permit id: 6613586 |