Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Hvac changeout same for same condenser & air handler Date: August 6, 2013 | |||||
Ti per ti checklist need site plan showing hc and route, code anal per handout, electrical per handout contractor has plans and appl ls 5/23 cont. Took plan to have signed by elect/iecc and get mech plan. Cgr ilo for c of c 1/21/14 refer to mech ap# 242086 Date: September 18, 2013 Permit type: Tenant improvement | |||||
Revised elec - added fixtures Permit type: Application for revisions | Permit id: 246903 | |||||
Revised elec - added fixtures Permit type: Application for revisions | Permit id: 246903 | |||||
Revised elec - added fixtures Permit type: Application for revisions | Permit id: 246903 | |||||
Ti per ti checklist need site plan showing hc and route, code anal per handout, electrical per handout contractor has plans and appl ls 5 23 cont. Took plan to have signed by elect iecc and get mech plan. Cgr ilo for c of c 1 21 14 refer to mech ap# 242086 Date: September 18, 2013 Permit type: Tenant improvement | Permit id: 229200 | |||||
SCORE 59 Date: September 3, 2009 Contractor: Herb Garden Productions | |||||
SCORE 100 Storage (non-combustable - not s-1) - ti Permit type: Ti | |||||
SCORE 100 3d_032_hvac exact change out | |||||
SCORE 100 3d_032_hvac exact change out | |||||
SCORE 59 Date: September 3, 2009 Contractor: Herb Garden Productions | |||||
SCORE 100 Storage (non-combustable - not s-1) - ti Permit type: Ti |