ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Date: December 15, 2004Permit id: 04-12-130 | Parcel: 001010001000 | |||||
Date: March 4, 2005Permit id: 05-03-037 | Parcel: 001010001000 | |||||
Date: May 6, 2009Permit id: 09-05-009 | Parcel: 072092028000 | |||||
Date: May 15, 2012Permit id: 12-05-062 | Parcel: 072092026000 | |||||
Date: March 5, 2013Permit id: 13-03-009 | Parcel: 072092024000 | |||||
SCORE 89 Install 3 4" water meter; new sfd, bridgeway lakes 1 phase 4. Temporary water paid for six months from issuance date. Date: December 19, 2004 Contractor: Shea Homes Limited PtnshpPermit id: 04-1533 | |||||
SCORE 89 Install 3 4" water meter; new sfd, bridgeway lakes 1 phase 4. Temporary water paid for six months from issuance date. Date: March 6, 2005 Contractor: Shea Homes Limited PtnshpPermit id: 05-0382 | |||||
4 sf gunite pool. A pre-inspection is required! Final engineering encroachment inspection is required 48 hrs prior to requesting for building permit final inspection. All work shall comply with city standards. Any damage to the curb, gutter, sidewalk or landscape will be repaired prior to finalization of encroachment permit and deposit refund. Existing driveway approach only shall be used for access. Engineering inspection request line (916) 617-4692 Date: May 6, 2009Permit id: 09-0128 | Parcel: 072092028000 |