Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Dccr proposes to drill one geotechnical boring (pragi-02) located in the eastbound parking lane of n street nw (3613 n st nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids). In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematics for additional information. The work will take up to 1 week to complete and will require 24/7 occupancy of the work area as well Date: September 23, 2015 Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa116463 | |||||
SCORE 100 Dccr proposes to drill one geotechnical boring (pragi-02) located in the eastbound parking lane of n street nw (3613 n st nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids). In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematics for additional information. The work will take up to 1 week to complete and will require 24 7 occupancy of the work area as well Date: September 23, 2015 Contractor: E2cr Inc Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa116463 | |||||
SCORE 99 Construction staging area Date: December 14, 2015 Contractor: E2cr C O Siva Balu Permit status: Permit expired | Expiration date: January 16, 2016 | Permit id: Pa10223512 |