ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 60 Existing plumbing currently run above grade along the west wall of the house. New work is to move the plumbing off of the west wall and below grade so it will be underneath the finished floor of the basement. Installations per file wheaton basement picture of current main drainage line and proposed location is included in file plumbing adding floor drain by existing hot water heater because no floor drain is present currently adding rough installation of a toilet, sink, and floor drain on the south end of the basement expanding the outer portion of the house to attach existing garage to the house. Current stairwell is too narrow and does not meet code. The additional square footage of the house extending toward existing garage will allow new stairwell to be built to code. Addition is indicated on file site plan and details are in attached engineering drawings in the as built folder. Date: March 7, 2016Permit status: Inspections | Completion date: March 29, 2016 | Current use: Residential | Permit id: Bld2016-02055 | |||||
SCORE 56 Permit authorized for laundry room only. Building permit required for bathroom, any work beyond scope will accrue stop work order and fines to contractor. Replacing sub rough plumbing and adding sub rough plumbing for future bath, Date: February 24, 2016 Contractor: Gale Curtis Barneswheaton RemodlePermit type: Plumbing | Permit status: Inspections | Completion date: February 25, 2016 | Current use: Residential | Permit id: Bld2016-01621 | |||||
SCORE 63 Dig out basement 2 and pour new floor to make the space usable. Doorway widened to allow washer dryer installation in the basement. Date: June 26, 2014Permit status: Completed | Completion date: August 11, 2014 | Current use: Residential | Permit id: Bld2014-04520 | |||||
SCORE 63 Existing plumbing currently run above grade along the west wall of the house. New work is to move the plumbing off of the west wall and below grade so it will be underneath the finished floor of the basement. Installations per file wheaton basement picture of current main drainage line and proposed location is included in file plumbing adding floor drain by existing hot water heater because no floor drain is present currently adding rough installation of a toilet, sink, and floor drain on the south end of the basement expanding the outer portion of the house to attach existing garage to the house. Current stairwell is too narrow and does not meet code. The additional square footage of the house extending toward existing garage will allow new stairwell to be built to code. Addition is indicated on file site plan and details are in attached engineering drawings in the as built folder. Date: March 7, 2016Permit status: Inspections | Completion date: March 29, 2016 | Current use: Residential | Permit id: Bld2016-02055 | |||||
SCORE 56 New wiring for addition and replacing cloth ungrounded or unprotected wiring in basement in preparation for finishing. Date: October 6, 2016 Contractor: Mr.Basement And AdditionPermit type: Electrical | Permit status: Inspections | Completion date: October 7, 2016 | Current use: Residential | Permit id: Bld2016-09304 |