ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 59 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 19, 2014 Contractor: Eugene Kevin MccormickPermit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: May 19, 2015 | Permit id: Pds2014-Resalt- | |||||
755sf restructure roof of att. Garage oriented strand board plywood () and oakridge shingles (er-5443) for existing sfd. 11-06-14 plan change: added structural details... See coa tlh 10 13 2014: certified copied plans -- . 5-hrs of staff time... M1a your project may need to comply with cool roof requirements based on the 2013 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for aged solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Date: August 5, 2014 Value: $23,405Permit type: Other : 33 - res - m | Permit status: Permit finaled | Completion date: May 1, 2015 | Permit id: Pds2014-Resalt- | |||||
SCORE 72 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 19, 2014 Contractor: Gene Mc Cormick ConstructionPermit type: Residential alteration-addn | Permit status: Completed | Completion date: May 19, 2015 | Permit id: Pds2014-Resalt- | |||||
755sf restructure roof of att. Garage oriented strand board plywood () and oakridge shingles (er-5443) for existing sfd. 11-06-14 plan change added structural details... See coa tlh 10/13/2014 certified copied plans -- . 5-hrs of staff time... M1a your project may need to comply with cool roof requirements based on the 2013 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for aged solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Date: August 5, 2014 Value: $23,405Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 1, 2015 | Permit id: Pds2014-Resalt- | |||||
755sf restructure roof of att. Garage oriented strand board plywood () and oakridge shingles (er-5443) for existing sfd. 11-06-14 plan change added structural details... See coa tlh 10 13 2014 certified copied plans -- . 5-hrs of staff time... M1a your project may need to comply with cool roof requirements based on the 2013 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for aged solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Date: August 5, 2014 Value: $23,405Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 1, 2015 | Permit id: Pds2014-Resalt- | |||||
SCORE 95 Extended battery storage system for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 21, 2017 Contractor: Solarcity CorporationPermit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
Stormwater insp Date: November 7, 2016Permit status: Monitor | Permit id: Pds2007-1004-20 | |||||
Stormwater insp Date: September 8, 2015Permit status: Monitor | Permit id: Pds2007-1004-20 | |||||
Rough frame Date: December 29, 2014Permit status: Cancel | Permit id: Pds2014-Resalt- | |||||
Stormwater insp Date: May 14, 2013Permit status: Monitor | Permit id: Pds2007-1004-20 | |||||
Stormwater insp Date: April 23, 2012Permit status: Monitor | Permit id: Pds2007-1004-20 | |||||
Stormwater insp Date: December 9, 2011Permit status: Monitor | Permit id: Pds2007-1004-20 | |||||
Foundation/steel/holdowns/abs/2nd Date: November 4, 2010Permit status: Pass | Permit id: Pds2007-1004-20 | |||||
Foundation/steel/holdowns/abs/2nd Date: November 6, 2009Permit status: Pass | Permit id: Pds2007-1004-20 | |||||
Foundation/steel/holdowns/abs/2nd Date: November 24, 2008Permit status: Fail | Permit id: Pds2007-1004-20 |