ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Date: October 13, 2004Permit id: 04-10-110 | Parcel: 001010001000 | |||||
Date: March 4, 2005Permit id: 05-03-047 | Parcel: 001010001000 | |||||
Date: March 26, 2008Permit id: 08-03-149 | Parcel: 072112024000 | |||||
Date: May 10, 2011Permit id: 11-05-039 | Parcel: 072112024000 | |||||
SCORE 89 Install 3 4" water meter; new sfd, bridgeway lakes 1 phase 4. Temporary water paid for six months from issuance date. Date: October 17, 2004 Contractor: Shea Homes Limited PtnshpPermit id: 04-1226 | |||||
SCORE 89 Install 3 4" water meter; new sfd, bridgeway lakes 1 phase 4. Temporary water paid for six months from issuance date. Date: March 6, 2005 Contractor: Shea Homes Limited PtnshpPermit id: 05-0391 | |||||
SCORE 100 Pool- access will be from the sideyard. Soil relocation requires written permission from receiving location. A pre-inspection is required! All work shall comply with city standards and details. Final engineering encroachment inspection is required prior to building permit final inspection. Any damage to the curb, gutter, sidewalk or landscape will be repaired prior to finalization of encroachment permit and deposit refund. Any damage to the curb, gutter, sidewalk, tree or landscape will be re Date: May 11, 2011 Contractor: Premier PoolsPermit id: 11-0100 | Parcel: 072112024000 |