ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 64 Unit legalization Date: August 21, 2013 Contractor: Two Sfds On One Lot InquiryPermit status: Approved | Completion date: October 23, 2013 | Permit id: Bld2013-05940 | |||||
SCORE 74 R&r 13 windows, no size to be altered r. M. R-2 window replacement per plnhlc2013-003 a. S. Date: June 17, 2013 Contractor: Restore Utah Construction Llcrestore UtahPermit type: Permit | Permit status: Pass | Completion date: October 1, 2013 | Current use: Residential | Permit id: Bld2013-04051 | |||||
SCORE 64 Basic re-wire as required. Add kitchen circuits. Add outlets and lights as possible. Interconnect smoke detectors Date: April 26, 2013 Contractor: Rex Fletcher Eledouglas RemodelPermit type: Electrical | Permit status: Pass | Completion date: July 31, 2013 | Current use: Residential | Permit id: Bld2013-02603 | |||||
SCORE 64 Cut in one window in basement, no structural engineer reqd, cut straight down, remove kitchen cabinets, no elec/plmbg/mech r. M. R-2 zone, approval per coa plnhlc2013-00183 n. L. Date: March 29, 2013Permit type: Permit | Permit status: Pass | Completion date: October 1, 2013 | Current use: Residential | Permit id: Bld2013-01862 | |||||
SCORE 59 Installing 13 solar panels on the south and east (front) sides of the existing pitched roof. Date: July 19, 2016 Contractor: Mountain West Solarsolar Panel InstallationPermit type: Historic landmark commission | Permit status: Active | Completion date: August 3, 2016 | Current use: Minor alteration | Permit id: Plnhlc2016-0056 |