Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Suppression permit Date: May 24, 2016 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 682764 | |||||
Administrative permit Date: May 2, 2011 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 331873 | |||||
Administrative permit Date: December 1, 2016 Client: Childrens Hospital Of Ph | Permit status: Active | Permit id: 731950 | |||||
Mechanical permit Date: December 3, 2015 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 640833 | |||||
Electrical permit Date: May 31, 2013 Client: Childrens Hospital Of Ph | Permit status: Expired | Permit id: 454430 | |||||
Administrative permit Date: August 27, 2010 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 298475 | |||||
Electrical permit Date: May 31, 2011 Client: Childrens Hospital Of Ph | Permit status: Expired | Permit id: 336796 | |||||
Alteration permit Date: May 20, 2015 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 607181 | |||||
Sign permit Date: July 8, 2011 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 346756 | |||||
Electrical permit Date: September 18, 2015 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 631517 | |||||
Suppression permit Date: June 18, 2012 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 403834 | |||||
Electrical permit Date: September 14, 2007 Client: Childrens Hospital Of Ph | Permit status: Expired | Permit id: 96028 | |||||
Mechanical permit Date: May 14, 2013 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 466329 | |||||
Administrative permit Date: May 11, 2015 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 609021 | |||||
Alteration permit Date: December 8, 2016 Client: Childrens Hospital Of Ph | Permit status: Active | Permit id: 739721 | |||||
Suppression permit Date: June 4, 2010 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 278277 | |||||
Plumbing permit Date: July 2, 2008 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 154268 | |||||
Alteration permit Date: May 2, 2011 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 314709 | |||||
Plumbing permit Date: November 18, 2013 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 499854 | |||||
Suppression permit Date: May 2, 2011 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 310182 | |||||
Plumbing permit Date: June 23, 2010 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 285847 | |||||
Alteration permit Date: April 1, 2010 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 268902 | |||||
Alteration permit Date: January 6, 2017 Client: Childrens Hospital Of Ph | Permit status: Active | Permit id: 744968 | |||||
Addition permit Date: October 8, 2008 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 155263 | |||||
New construction permit Date: July 5, 2012 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 404496 | |||||
Mechanical permit Date: October 5, 2011 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 361374 | |||||
Electrical permit Date: November 26, 2008 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 167055 | |||||
Suppression permit Date: August 10, 2009 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 165499 | |||||
Suppression permit Date: December 5, 2008 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 184668 | |||||
Administrative permit Date: November 12, 2013 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 483609 | |||||
Zoning use permit Date: December 20, 2013 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 504776 | |||||
Plumbing permit Date: July 27, 2015 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 611872 | |||||
Plumbing permit Date: January 6, 2017 Client: Childrens Hospital Of Ph | Permit status: Active | Permit id: 729887 | |||||
Plumbing permit Date: October 11, 2007 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 105553 | |||||
Zoning use permit Date: August 20, 2014 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 543113 | |||||
Electrical permit Date: December 19, 2012 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 412966 | |||||
New construction permit Date: March 22, 2011 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 325997 | |||||
Suppression permit Date: July 16, 2014 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 508248 | |||||
Plumbing permit Date: July 26, 2012 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 411292 | |||||
Zoning use permit Date: June 13, 2011 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 335618 | |||||
Administrative permit Date: May 1, 2012 Client: Childrens Hospital Of Ph | Permit status: Expired | Permit id: 376541 | |||||
Zoning admin review Date: December 20, 2013 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 512314 | |||||
Administrative permit Date: August 11, 2009 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 227634 | |||||
Mechanical permit Date: November 20, 2007 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 107431 | |||||
New construction permit Date: August 9, 2007 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 90021 | |||||
Suppression permit Date: September 17, 2013 Client: Childrens Hospital Of Ph | Permit status: Expired | Permit id: 495198 | |||||
Suppression permit Date: January 19, 2017 Client: Childrens Hospital Of Ph | Permit status: Active | Permit id: 752950 | |||||
Alteration permit Date: October 3, 2008 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 178004 | |||||
Electrical permit Date: October 28, 2016 Client: Childrens Hospital Of Ph | Permit status: Active | Permit id: 722086 | |||||
Electrical permit Date: July 7, 2009 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 187775 | |||||
Plumbing permit Date: June 14, 2016 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 689673 | |||||
Operations permit Date: June 10, 2011 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 21081 | |||||
Mechanical permit Date: December 29, 2016 Client: Childrens Hospital Of Ph | Permit status: Active | Permit id: 730330 | |||||
Zoning use permit Date: April 27, 2012 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 329992 | |||||
Sign permit Date: August 20, 2014 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 543362 | |||||
Alteration permit Date: November 5, 2007 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 83931 | |||||
Mechanical permit Date: August 13, 2010 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 284682 | |||||
Zoning use permit Date: June 10, 2010 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 284519 | |||||
Zoning permit Date: March 24, 2008 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 82340 | |||||
Plumbing permit Date: June 27, 2011 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 345928 | |||||
Alteration permit Date: January 11, 2013 Client: Childrens Hospital Of Ph | Permit status: Expired | Permit id: 440365 | |||||
Administrative permit Date: August 9, 2007 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 94535 | |||||
Use permit Date: May 10, 2011 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 340095 | |||||
Addition permit Date: April 18, 2013 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 450090 | |||||
Zoning use permit Date: April 29, 2008 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 145490 | |||||
Mechanical permit Date: January 6, 2017 Client: Childrens Hospital Of Ph | Permit status: Active | Permit id: 743152 | |||||
Sign permit Date: June 22, 2010 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 284639 | |||||
New construction permit Date: May 13, 2013 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 465154 | |||||
Suppression permit Date: August 18, 2015 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 632830 | |||||
Administrative permit Date: February 19, 2008 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 66402 | |||||
Operations permit Date: November 13, 2015 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 23854 | |||||
Operations permit Date: April 2, 2012 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 21507 | |||||
Mechanical permit Date: August 21, 2008 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 151650 | |||||
Mechanical permit Date: January 20, 2009 Client: Childrens Hospital Of Ph | Permit status: Completed | Permit id: 134656 | |||||
Permit for the erection of a ninth through fourteenth story addition to an existing eight (8) story structure for use as extension of an existing ambulatory care facility and for the creation of one (1) open-air off-street loading space as part of an existing open-air off-street loading area with twelve (12) spaces. Size and location as shown in the application. Date: September 14, 2012 Client: Childrens Hospital Of Ph | Applicant: William Martin, Esquire | Permit type: Appeal | Permit status: Granted | Completion date: October 24, 2012 | Permit id: 18877 | |||||
Permit for the erection of an eight (8) story addition over the below grade parking garage and a four (4) story addition for the extension of research facility & central utility plant with increase in accessory parking spaces for a new total of 1,517 spaces including 193 handicap spaces and increase in accessory off street loading spaces for a new total of 12 loading spaces including 2 trash spaces. Date: May 12, 2011 Client: Childrens Hospital Of Ph | Applicant: Fox Rothchild | Permit type: Appeal | Permit status: Granted | Completion date: June 13, 2011 | Permit id: 15138 | |||||
Permit is for the reconfiguration of a loading dock and the erection of a partially enclosed roof for the loading dock over an existing research facility. Date: September 11, 2007 Client: Childrens Hospital Of Ph | Applicant: Paul P. Padien, Esq. | Permit type: Appeal | Permit status: Granted | Completion date: October 13, 2007 | Permit id: 3011 | |||||
On 02 04 2015, the department of licenses and inspections issued an notice of refusal for application #560993. Date: February 9, 2015 Client: Childrens Hospital Of Ph | Applicant: Turner Construction Co | Permit type: Appeal | Permit status: Approved | Completion date: July 13, 2015 | Permit id: 24592 | |||||
The work is not "construction" as defined by section 9-100(2)(c) of the city of philadelphia code, and does not require permits. Date: September 1, 2015 Client: Childrens Hospital Of Ph | Applicant: William Martin, Esquire | Permit type: Appeal | Permit status: Moot | Permit id: 26009 | |||||
On 1 09 12, the department of licenses and inspections issued a notice of refusal for application #376541. Date: February 2, 2012 Client: Childrens Hospital Of Ph | Applicant: Childrens Hospital Of Philadelphia | Permit type: Appeal | Permit status: Approved | Permit id: 17170 | |||||
On 7 9 07 department of licenses and inspections issued refusal of permit for application #83931. Date: July 27, 2007 Client: Childrens Hospital Of Ph | Applicant: Gary Brunell, Aia | Permit type: Appeal | Permit status: Approved | Permit id: 2851 | |||||
SCORE 99 Relocation of (10) sprinkler heads Date: May 2, 2011 Contractor: Northstar Fire Protection Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Completed | Completion date: December 27, 2011 | Permit id: 310182 | |||||
SCORE 100 Upgrade childrens hospitals medical surgical use to picu ssu per plan. Date: May 2, 2011 Contractor: L F Driscoll Company Llc Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: December 27, 2011 | Permit id: 314709 | |||||
SCORE 95 Permanent sheeting & shoring along east service drive for the excavation of new construction and temporary sheeting & shoring along health service drive for the excavation of new construction. Date: March 22, 2011 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: New construction permit | Permit status: Completed | Completion date: June 23, 2012 | Permit id: 325997 | |||||
For the erection of an eight (8) story addition over the below grade parking garage and a four (4) story addition (size and location as shown in the application). For the extension of research facility & central utility plant with increase in accessory parking spaces for a new total of 1,517 spaces including 193 handicap spaces and increase in accessory off street loading spaces for a new total of 12 loading spaces including 2 trash spaces. No sign on this permit. Date: April 27, 2012 Client: Childrens Hospital Of Ph | Permit type: Zoning/use permit | Permit status: Completed | Completion date: January 29, 2013 | Permit id: 329992 | |||||
SCORE 99 Amend permit #239411 to correct address of proposed construction Date: May 2, 2011 Contractor: L F Driscoll Co Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Completed | Completion date: June 6, 2011 | Permit id: 331868 | |||||
SCORE 99 Amend permit #316833 to correct address of proposed construction on the 5th floor. Date: May 2, 2011 Contractor: L F Driscoll Co Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Completed | Completion date: December 27, 2011 | Permit id: 331873 | |||||
SCORE 99 Amend permit #321842 to correct address (35 civic center blvd.) of proposed construction. Previous address was 34 civic center blvd. Date: May 2, 2011 Contractor: L F Driscoll Co Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Completed | Completion date: June 28, 2011 | Permit id: 331874 | |||||
SCORE 100 Modify existing wet system into preaction. Date: May 12, 2011 Contractor: Majek Fire Protection, Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Completed | Completion date: January 10, 2012 | Permit id: 333194 | |||||
SCORE 99 Perform repairs to existing concrete beams inside the wood bldg in garage at chop Date: December 19, 2011 Contractor: L F Driscoll Co Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Expired | Completion date: March 26, 2013 | Permit id: 336139 | |||||
SCORE 99 Install decoration shelving and monitor system. Date: June 1, 2011 Contractor: L F Driscoll Co Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: June 5, 2014 | Permit id: 336149 | |||||
SCORE 100 Install fire alarm devices and cabling as per nfpa-72 (west dist) Date: May 31, 2011 Contractor: Adams Electrical Const Inc Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Expired | Completion date: May 31, 2011 | Permit id: 336796 | |||||
SCORE 100 Installation of an automatic clean agent, inert gas suppression system Date: May 3, 2011 Contractor: Suppression Systems Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Completed | Completion date: January 9, 2012 | Permit id: 337850 | |||||
SCORE 99 Revise bldg permit# 303021 to include structural modifications. Also revise address of proposed construction to reflect correct prop owners name Date: June 1, 2011 Contractor: L F Driscoll Co Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Completed | Completion date: June 23, 2012 | Permit id: 338599 | |||||
SCORE 99 Interior alterations to create new media room at lobby level. Date: June 1, 2011 Contractor: L F Driscoll Co Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: January 10, 2012 | Permit id: 338596 | |||||
SCORE 99 Media center accessory to an existing hospital complex with all other uses as previously approved. No sign on this permit. Date: May 10, 2011 Contractor: L F Driscoll Co Client: Childrens Hospital Of Ph | Permit type: Use permit | Permit status: Completed | Completion date: January 29, 2013 | Permit id: 340095 | |||||
SCORE 100 Installation of (4)additional sinks Date: April 30, 2013 Contractor: Burns Mechanical Inc Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Completed | Completion date: December 3, 2013 | Permit id: 465794 | |||||
SCORE 100 Renovate existing mechanical ductwork as per plans. Date: May 14, 2013 Contractor: Burns Mechanical Inc Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 24, 2013 | Permit id: 466329 | |||||
SCORE 100 For level ii alterations on the second floor of an existing building. Alterations to include erection of partition walls, replacement of equipment and all other alteration to be done per approved plans. Building is fully sprinklered. Separate permits required for mechanical, electrical, plumbing and fire supression work. Date: November 1, 2013 Contractor: L F Driscoll Company Llc Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Expired | Completion date: October 22, 2014 | Permit id: 474340 | |||||
SCORE 95 For amendment of permit ap#s 404496, 429576, & 4500 for a change of exterior curtain wall floor assembly intersection firestopping system & fire-protection assembly for strutural steel framing for a high-rise ambulatory care center. Date: November 12, 2013 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Completed | Completion date: July 27, 2015 | Permit id: 483609 | |||||
SCORE 100 Installation of fire suppression system on tower levels 1 through 4 in accordance with nfpa 13 as per approved plans. Date: July 16, 2014 Contractor: Majek Fire Protection, Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Completed | Completion date: June 8, 2015 | Permit id: 490611 | |||||
SCORE 100 Relocate 24 sprinkler heads Date: September 17, 2013 Contractor: Majek Fire Protection, Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Expired | Completion date: October 10, 2014 | Permit id: 495198 | |||||
SCORE 100 Addition 4-floors to bldg, floors are core & shell space only, extend stacks, vents & storm water up thru addl 4 stories & add 15 addl roof drains - orig permit # 436745 (hospital) Date: November 18, 2013 Contractor: A T Chadwick Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 13, 2015 | Permit id: 499854 | |||||
SCORE 99 For the installation of hvac mechanical system, to include stair pressurization ductwork, exhaust ducts, and refrigerant piping at 9th thru 13th floors. (future hvac expansion to upper additions to require separate permit.) Date: December 19, 2013 Contractor: S S M Industries, Inc Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 15, 2015 | Permit id: 503293 | |||||
SCORE 100 Install (2) illum identification logo signs on wall 7" x15 (158. 7 sq ft.) Date: January 24, 2014 Contractor: City Sign Service Inc Client: Childrens Hospital Of Ph | Permit type: Sign permit | Permit status: Completed | Completion date: May 20, 2015 | Permit id: 514564 | |||||
SCORE 100 Install voice and data cables Date: March 15, 2007 Contractor: M Gitlin Co Inc Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Completed | Completion date: June 21, 2008 | Permit id: 54161 | |||||
SCORE 100 Install 3 signs- 1 single-face illum parking clearance sign, 1 single-face illum parking clearance sign, 1 single-face illum parking clearance sign, installation of directional signs n. T. E. 7 in height Date: August 20, 2014 Contractor: Forman Signs Company Inc Client: Childrens Hospital Of Ph | Permit type: Zoning/use permit | Permit status: Completed | Completion date: August 20, 2014 | Permit id: 543113 | |||||
SCORE 100 For the erection of three (3) double-faced free-standing signs; for the erection of three (3) wall signs. No change in height or area of existing structure(s) this permit. Sizes and locations as shown in application plan. Signs accessory to an existing hospital as previously approved with accessory parking garage. Date: August 20, 2014 Contractor: Forman Signs Company Inc Client: Childrens Hospital Of Ph | Permit type: Sign permit | Permit status: Completed | Completion date: June 24, 2015 | Permit id: 543362 | |||||
SCORE 100 Level ii interior alterations (no change of occupancy) for renovations to existing exam rooms on fourth and fifth floors of an existing medical facility as per approved plans. Existing building fully sprinklered. Separate permits required for any mep or fire suppression work Date: June 23, 2016 Contractor: Target Building Construction Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: November 9, 2016 | Permit id: 693300 | |||||
SCORE 100 Alterations: interior plumbing; new fixtures and equipment in health care work space - the installation will compy with the philadelphia plumbing code 2004. Date: July 5, 2016 Contractor: A T Chadwick Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 9, 2016 | Permit id: 695958 | |||||
SCORE 99 Renovation to shell space to create office: installing new fixtures and receptacles per 2008 nec (health care)west district Date: July 28, 2016 Contractor: J P Rainey And Co Inc Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Completed | Completion date: November 9, 2016 | Permit id: 702235 | |||||
SCORE 100 For the installation of two (2) new doors to access an existing ambulatory health space in accordance with department of health approved plans. Date: August 4, 2016 Contractor: Target Building Construction Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: February 28, 2017 | Permit id: 709781 | |||||
SCORE 95 Infrastructure expansion to facilitate the fit-out of levels 9-12 of the chop bueger center. Installation of a complete modular mechanical penthouse on level 13, which will supply hvac to levels 9-12. Installation of (3) new public elevators and (1) new service elevator in existign hoistways. Miscellaneous demolitio to existing shaft walls, slabs, and roofing to accomodate the relocation and installtion of mechancial risers. Installation of new steel, roofing, exterior wall system to accomodate penthouse and stair extensions as per plan. Separate permit is required for m. E. P. S Date: December 16, 2016 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Active | Completion date: November 6, 2017 | Permit id: 720089 | |||||
SCORE 99 Addition of 1 set electricity held door including 1 life safety 120v circuit as per nec 2008 west district and fire alarm interface as per nfpa 72 Date: October 28, 2016 Contractor: J P Rainey And Co Inc Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Expired | Completion date: October 28, 2016 | Permit id: 722086 | |||||
SCORE 95 Tco for 6th floor and partial 1st floor (phlebotomy and touchdown) Date: October 5, 2016 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Completed | Completion date: October 17, 2016 | Permit id: 726935 | |||||
SCORE 91 Install lighting on p1 garage level per plans. Date: March 26, 2015 Contractor: Carr And Duff Inc Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Completed | Completion date: October 14, 2016 | Permit id: 595638 | |||||
SCORE 100 Alterations: interior plumbing; fit-out of levels 9-12 of the chop bueger center - the installation will comply with the philadelphia plumbing code 2004 Date: January 6, 2017 Contractor: A T Chadwick Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Active | Completion date: November 6, 2017 | Permit id: 729887 | |||||
SCORE 62 For the installation of a new hvac system including 74 new registers diffusers, appliances and associated ductwork as per plans. Date: December 29, 2016 Contractor: Edward J Deseta Company Inc Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Active | Completion date: November 6, 2017 | Permit id: 730330 | |||||
SCORE 83 Amending permit 720089 to erect platforms to support 35t stiffleg derrick crane and tg-19 tower gantry crane, to include erection, operation and disassembley of both cranes, to facilitate addition to existing facility. Date: December 1, 2016 Contractor: Cornell And Company Inc Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Active | Completion date: November 15, 2017 | Permit id: 731950 | |||||
SCORE 100 Level ii interior alterations (no change of occupancy) for renovations to level p1 of an existing medical facility (buerger center) as per approved plans and pa doh approvals. Existing building fully sprinklered. Separate permits required for any mep or fire suppression work Date: December 8, 2016 Contractor: Target Building Construction Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: July 14, 2017 | Permit id: 739721 | |||||
SCORE 100 Install complete sprinkler system throughout as per fp drawings, 13, 8" feed main, 6" stand pipes to existing system. Refer additional info fsp #465727 & 440439 Date: July 16, 2014 Contractor: Majek Fire Protection, Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Completed | Completion date: June 8, 2015 | Permit id: 508248 | |||||
SCORE 95 For interior level 2 alterations and fit-out for an ambulatory health care facilities in an existing high-rise structure as per plans. Separate permits required for all mechanical, electrical, plumbing and fire suppression work. Date: December 16, 2016 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Active | Completion date: November 6, 2017 | Permit id: 733035 | |||||
SCORE 100 10 22 2015 - erect cook tent (30x30) at childrens hospital of philadelphia Date: November 13, 2015 Contractor: Knight Enterprises Inc Client: Childrens Hospital Of Ph | Permit type: Operations permit | Permit status: Completed | Permit id: 23854 | |||||
SCORE 95 Tco for 2nd floor research center chop hospital Date: January 19, 2010 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Completed | Completion date: January 20, 2010 | Permit id: 257886 | |||||
SCORE 99 Interior alterations to create an inpatient unit. Date: May 2, 2011 Contractor: L F Driscoll Co Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: January 9, 2012 | Permit id: 261229 | |||||
SCORE 95 Interior fit out of prior shell space and mechanical storage rooms of new building, new finishes, partitions, doors, ceilings, piping, as per submitted plans. High rise provisions. Phase 3 of construction, see ap90021, 155263 Date: April 1, 2010 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: January 3, 2011 | Permit id: 268902 | |||||
For the erection of a ninth through fourteenth story addition to an existing eight (8) story structure. Size and location as shown in the application. Addition for use as extension of an existing ambulatory care facility and for the creation of an open-air off-street loading area with a new total of thirteen (13) loading spaces. Date: October 23, 2012 Client: Childrens Hospital Of Ph | Permit type: Zoning/use permit | Permit status: Completed | Completion date: January 29, 2013 | Permit id: 421983 | |||||
SCORE 70 Secondary power distribution as well as branch power and lighting installation systems are not included in this scope of work as per 2008 nec(parking garage) Date: January 7, 2013 Contractor: Allan Briteway Electrical Cont Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Completed | Completion date: August 17, 2016 | Permit id: 423787 | |||||
SCORE 100 Interior fit-out and co for floors 1-5 and underground parking center for ambulatory care center garage addition to existing colkett transitional research building and central utility plant. Addition designed for current b s-2 and future i-2 use. See bbs variance #17170. Construction of shell permitted under permit #404496. Separate permits required for fit-out of floors 6-7 and any spaces identified as shell. Date: October 11, 2012 Contractor: Target Building Construction Client: Childrens Hospital Of Ph | Permit type: New construction permit | Permit status: Completed | Completion date: September 1, 2015 | Permit id: 429576 | |||||
SCORE 95 Tco for floors 7 8 9 11 12 and penthouse. Parent permit # 155263 Date: March 29, 2010 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Completed | Completion date: October 26, 2010 | Permit id: 269265 | |||||
SCORE 100 Install fire sprinkler system on 9th flr. To existing system. Phase 2 of research facility Date: June 4, 2010 Contractor: Majek Fire Protection, Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Completed | Completion date: June 6, 2011 | Permit id: 278277 | |||||
SCORE 100 For the placement of a sign on to a pedestrian site barrier as shown on the approved plans. The sign must be maintained in good repair and must not become a hazard for pedestrian and automobile traffic. Date: July 21, 2010 Contractor: City Sign Service Inc Client: Childrens Hospital Of Ph | Permit type: Sign permit | Permit status: Completed | Completion date: November 8, 2010 | Permit id: 279187 | |||||
For the erection of one (1) flat wall sign 1. 25 1 16" x 60-1 2 ", size and location as shown in application. Sign accessory to a research center within an existing hospital complex. Date: June 10, 2010 Client: Childrens Hospital Of Ph | Permit type: Zoning/use permit | Permit status: Completed | Completion date: January 29, 2013 | Permit id: 284519 | |||||
SCORE 99 Hvac system including ductwork on the 9th floor as per plans. Date: August 13, 2010 Contractor: S S M Industries, Inc Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 31, 2011 | Permit id: 284682 | |||||
SCORE 56 For the installation of one (1) non illuminated wall sign. Sign installation and supporting canopy elements shall be erected per p. E. Sealed drawings. Date: June 22, 2010 Contractor: Adelphia Graphic Systems Client: Childrens Hospital Of Ph | Permit type: Sign permit | Permit status: Completed | Completion date: August 27, 2010 | Permit id: 284639 | |||||
SCORE 100 32 fixtures with piping for the 8th and 9th floors Date: June 23, 2010 Contractor: A T Chadwick Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Completed | Completion date: February 7, 2011 | Permit id: 285847 | |||||
T. C. O for 9th floor of new high rise Date: August 27, 2010 Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Completed | Completion date: August 27, 2010 | Permit id: 298475 | |||||
SCORE 99 Replace and older phillips interventional radiology piece of equip with a new siemens zeego piece of equip per plan & reviewed by state (id # 550401-01; dab# h-a0-0789) Date: May 3, 2011 Contractor: L F Driscoll Co Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: December 27, 2011 | Permit id: 303731 | |||||
SCORE 99 New construction of parking & ambulatory care, fire alarm only in garage. Complete installation of the fire alarm and electrical for the ambulatory care bldg on low voltage work included in our package per 2008 nec & nfpa 72 (health care) Date: May 16, 2013 Contractor: J P Rainey And Co Inc Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Expired | Completion date: May 16, 2013 | Permit id: 432441 | |||||
SCORE 100 Relocate 37 heads to fit new wall ceiling layout Date: October 25, 2012 Contractor: Majek Fire Protection, Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Completed | Completion date: March 26, 2013 | Permit id: 434784 | |||||
SCORE 99 For installation of ductwork and supply registers to be connected to existing mechanical system. Separate mechanical and alterations permits (with pa doh approval) to be required prior to issuance of certificate of occupancy. Date: October 15, 2015 Contractor: S S M Industries, Inc Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 27, 2017 | Permit id: 636500 | |||||
SCORE 95 For level ii alterations to include the fitout of the first, second, sixth and seventh floor level of a health facility. Alterations to include the erection of parition walls for dining area, patient rooms, faculty room and business area. Building to be fully sprinklered. All work to be done per approved plans. If field conditions vary contact design professional prior to the start of any work. Separate permits required for mechanical, electrical, plumbing and fire suppression work. Date: October 22, 2015 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: November 8, 2016 | Permit id: 638059 | |||||
SCORE 95 Tco for app#611649. Date: September 11, 2015 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Completed | Completion date: May 30, 2016 | Permit id: 638063 | |||||
SCORE 99 For the partial demolition of existing hvac system and the installation of hvac system to include ducts, diffusers and dampers on the fourth floor accessory to an existing hospital complex as per plans. Date: December 29, 2010 Contractor: S S M Industries, Inc Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 23, 2012 | Permit id: 305997 | |||||
SCORE 95 Install fixtures,16 outlets and 4 switches as per 2008 nec Date: June 17, 2011 Contractor: Hatzel And Buehler Inc Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Completed | Completion date: October 28, 2015 | Permit id: 310088 | |||||
SCORE 100 Relocate heads to accomodate layout. Date: August 18, 2015 Contractor: Majek Fire Protection, Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Completed | Completion date: March 22, 2016 | Permit id: 632830 | |||||
SCORE 100 Interior renovations, alterations to 2nd floor ne main building space : offices, lounge area, patient rooms and smoke compartment. No change in use-occupancy classification. Additional permits required : electrical, pumbing, hvac, sprinklers Date: April 15, 2013 Contractor: L F Driscoll Company Llc Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: December 3, 2013 | Permit id: 463169 | |||||
SCORE 100 Installation of (2) above ground 8,0 gallon diesel fuel storage tanks at the bp2 garage and intall (1) above ground 9,4 gallon diesel fuel storage tank at the central utility plant as per plans. All work to be in accordance with pa d. E. P. Regulations, all applicable codes, nfpa and nfpa 31. Date: May 13, 2013 Contractor: Ycp Inc Client: Childrens Hospital Of Ph | Permit type: New construction permit | Permit status: Completed | Completion date: May 18, 2015 | Permit id: 465154 | |||||
SCORE 99 For part. Demo. Of exist. Hvac systems @ shells spaces & for the extension of main hvac system to serve previously approved fitout of upper levels of healthcare facility including patient, support & assembly spaces. Date: December 3, 2015 Contractor: S S M Industries, Inc Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 9, 2016 | Permit id: 640833 | |||||
SCORE 100 Supply 1 60kw generator for one day event oct 24th 2015 - generator is being supplied by keller electric as per 2008 nec (west district) Date: September 29, 2015 Contractor: Costa Electric Llc Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Expired | Completion date: September 29, 2015 | Permit id: 641631 | |||||
SCORE 100 Interior plumbing alterations to include the fit-out of the first, second, sixth and seventh floor level of a health facility - the installation will comply with the approved plans and the philadelphia plumbing code 2004 Date: January 26, 2016 Contractor: A T Chadwick Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 9, 2016 | Permit id: 655136 | |||||
SCORE 95 Amend permit # 90021 to include structural steel framing, as per plans above an existing below grade structure. Owner assumes all responsibility for any deviations to framing due to final building permit & c o review. Separate c o required. (originally reviewed as a structural frame permit, and was not issued before arch. Set was reviewed and issued.) Date: February 19, 2008 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Completed | Completion date: October 28, 2009 | Permit id: 66402 | |||||
SCORE 100 For the installation of a fire suppression system as per nfpa 13 to the 1st, 2nd, 6th, and 7th floor level. Existing mains to remain provide new lines and head for configured space. Date: May 24, 2016 Contractor: Independence Fire Sprinkler Co Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Completed | Completion date: November 9, 2016 | Permit id: 682764 | |||||
SCORE 100 Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: April 29, 2016 Contractor: Oliver Sprinkler Co Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Expired | Completion date: February 14, 2017 | Permit id: 688358 | |||||
SCORE 100 Amendment to plumbing permit#6097 due to plan changes to include changes to installations of plumbing vent stacks - the installation will compy with the philadelphia plumbing code 2004. Date: June 14, 2016 Contractor: Lormar Mechanical Services Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 9, 2016 | Permit id: 689673 | |||||
SCORE 100 Renovation of a shell space located in chop buerger building as per plans Date: May 26, 2016 Contractor: Target Building Construction Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: November 9, 2016 | Permit id: 692525 | |||||
SCORE 100 For the installation of ductwork, registers diffusers, and all other work as per approved plans. Separate permit required for plumbing and electrical work. Date: August 11, 2016 Contractor: A T Chadwick Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Completed | Completion date: February 28, 2017 | Permit id: 692915 | |||||
SCORE 99 Interior alterations, upgrades to finishes, minor changes to layout of 7ne inpatient unit area. No change in use occupancy. Date: October 19, 2011 Contractor: L F Driscoll Co Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: June 23, 2012 | Permit id: 354281 | |||||
SCORE 100 Renovations to existing hvac system inpatient unit area on 7th floor of hospital. In conjunction with bp354281 Date: December 7, 2011 Contractor: Tracey Mechanical Inc Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 23, 2012 | Permit id: 368297 | |||||
SCORE 95 Foundation only permit only lower levels and integrated tower crane foundation. Prior approvals, sheeting & shoring completed under ap325997, pwd approval. Owner assumes all responsibility for any changes due to final building construction permit review. Padoh approval required for final building construction approval. Special inspections engineered inspections for piling caissons. Separate tower crane submittals required as amendment permit. Date: May 3, 2012 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: New construction permit | Permit status: Completed | Completion date: May 28, 2015 | Permit id: 398516 | |||||
SCORE 100 Modify lighting, power, phone data on 12th and 13th floor as per 2008 nec(health care facility)(west dist) no fire alarm on this permit Date: July 10, 2012 Contractor: Gordon Group Electric Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Completed | Completion date: August 20, 2016 | Permit id: 398836 | |||||
Amend permit # 398516 to include erection and disassembly of 3 luffing boom tower crane to facilitate construction of the hospital Date: May 4, 2012 Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Completed | Completion date: January 28, 2015 | Permit id: 398966 | |||||
SCORE 100 Re-route standpipe to tie into stair b and relocate control valve assembly from stair g to stair b as per plans. Date: June 18, 2012 Contractor: Majek Fire Protection, Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Completed | Completion date: October 8, 2012 | Permit id: 403834 | |||||
SCORE 95 Construction of base building. Separate permits reqd for interior fit-outs, sprinklers, ductwork, and electric foundation construction approved in permit 398516 zoning approved in permit 329992 all work as part of extension of research facility & central utility plans with additional parking garage space childrens hospital of pennsylvania Date: July 5, 2012 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: New construction permit | Permit status: Completed | Completion date: September 1, 2015 | Permit id: 404496 | |||||
SCORE 100 Install of sanitary waste & vent piping install of water supply piping inst of bfps & hw hs inst of fountains (5) 4-wc,2-uri,6-lavs,6-sh,93-fl drains, 189-root drains, 7-trench drains (parking garage) Date: July 26, 2012 Contractor: Herman Goldner Co Inc Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 6, 2015 | Permit id: 411292 | |||||
SCORE 100 Distribution equipment for new hospital facility fitout of space as per nec 2008 (all) Date: December 19, 2012 Contractor: H B Frazer Co Penna Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Completed | Completion date: November 21, 2015 | Permit id: 412966 | |||||
SCORE 100 Install new food service area on the first floor (all work to comply with the 2004 ppc) Date: May 29, 2015 Contractor: A T Chadwick Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 11, 2016 | Permit id: 607783 | |||||
SCORE 100 Relocate 57 heads on floors 8-13 Date: May 17, 2012 Contractor: Majek Fire Protection, Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Completed | Completion date: June 23, 2012 | Permit id: 405769 | |||||
SCORE 100 For the alterations to an hvac mechanical system to provide new ductwork, to include dishwasher hood exhaust ducts, new rooftop kitchen exhaust fan new generator exhaust stacks, new condenser and split system air handlers, new refrigerant piping, new transfer fan installations, new unit heater installation, new stair pressurization fans, new variable frequency drives, new diffusers registers grilles, and associated fire smoke dampers. Date: June 4, 2015 Contractor: A T Chadwick Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 7, 2016 | Permit id: 607778 | |||||
SCORE 100 Amend original permit #429576 to change contractor for portion of work involving food service area on plaza level (plan areas g. H. J. And k). All work to be performed in accordance with origianl approved plan except for minor revisions as shown within area g. Date: June 17, 2015 Contractor: Target Building Construction Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Completed | Completion date: January 7, 2016 | Permit id: 608146 | |||||
SCORE 99 Fitout of shell space to create grab & go dining area - all fire alarm & lighting is existing & remains as per nec 2008 (health care facility) west district Date: June 5, 2015 Contractor: J P Rainey And Co Inc Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Expired | Completion date: June 5, 2015 | Permit id: 608424 | |||||
SCORE 95 Tco Date: May 11, 2015 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Completed | Completion date: May 20, 2015 | Permit id: 609021 | |||||
SCORE 100 New fixtures with reair and replacement to dwv and domestic water supply (all work to comply with the 2004 ppc) Date: July 24, 2015 Contractor: Lormar Mechanical Services Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 15, 2015 | Permit id: 609730 | |||||
SCORE 100 Furnish and install new drain, waste, vent and water supply piping per the approved plans for a pet mri in room 22 on the 2nd floor in injection rooms 2244, 2245, 2247, patient room 2246 & control room 2260a - work will comply with the phila plumbing code 2004 Date: July 27, 2015 Contractor: A T Chadwick Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 15, 2015 | Permit id: 611872 | |||||
SCORE 100 Mechanical alterations and hvac installations, as per plans and schedules. Date: June 3, 2015 Contractor: Lormar Mechanical Services Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 15, 2015 | Permit id: 612171 | |||||
SCORE 99 Fit out of former shell space to create tech room and infusion pools,new lighting,receptacles per 2008 nec (health care)install fire alarm per nfpa 72 Date: July 24, 2015 Contractor: J P Rainey And Co Inc Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Completed | Completion date: November 4, 2015 | Permit id: 620382 | |||||
SCORE 99 Supply and install lighting on screen wall provide circuits for signage per 2008 nec (health care ) Date: September 18, 2015 Contractor: J P Rainey And Co Inc Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Completed | Completion date: January 22, 2016 | Permit id: 631517 | |||||
SCORE 100 Diffuser renovation in service area on "a" level as part of hospital as per plans.. Date: October 5, 2011 Contractor: Tracey Mechanical Inc Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 23, 2012 | Permit id: 361374 | |||||
SCORE 82 Conduit and cable tray, voice and data cables cat 6, longest cable 200"(west dist) Date: November 30, 2007 Contractor: H B Frazer Co Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Completed | Completion date: June 21, 2010 | Permit id: 111070 | |||||
SCORE 99 T. C. O. Permit 172876, plan 15-a-04 Date: November 18, 2007 Contractor: L F Driscoll Co Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Completed | Completion date: June 15, 2015 | Permit id: 115298 | |||||
SCORE 66 Hvac activty in three locations admissions, coffee shop & office space. All work shall comply with the approved plans. Date: January 20, 2009 Contractor: Robinson John Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 16, 2009 | Permit id: 134656 | |||||
SCORE 96 Install laterals ( 2-12" &1-15") Date: April 2, 2008 Contractor: Andrew Garoppo Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 6, 2008 | Permit id: 142521 | |||||
SCORE 100 Install fire sprinkler to partial level a1 & a2 as per fire protection drawings Date: May 19, 2008 Contractor: Majek Fire Protection, Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Completed | Completion date: August 14, 2013 | Permit id: 146508 | |||||
Hvac including ductwork Date: August 21, 2008 Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 18, 2009 | Permit id: 151650 | |||||
SCORE 100 Chop south campus research phase 2a, water closets, lavys, urinal, drinking fountains, floor drains Date: July 2, 2008 Contractor: A T Chadwick Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 26, 2009 | Permit id: 154268 | |||||
SCORE 99 1st floor renovate existing exam room space to create a new layout 3rd floor renovate existing shell space to create open office space Date: June 3, 2008 Contractor: Frank V Radomski And Sons Inc Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: July 24, 2008 | Permit id: 155108 | |||||
SCORE 100 Installing new plumbing fixtures, waste and soil pipe throughout new facility (health care facility) Date: January 25, 2013 Contractor: A T Chadwick Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 14, 2015 | Permit id: 436745 | |||||
SCORE 100 Install new microprocessor based, high rise fire alarm system (west dist) Date: September 14, 2007 Contractor: Carr And Duff Co Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Completed | Completion date: May 27, 2010 | Permit id: 93821 | |||||
SCORE 100 Installation of all primary & secondary distribution systems as well as chiller plant equipment, recepts, lighting and sws in a 4 1 2 story medical research facility - phase 1 as per nec 2005 Date: August 9, 2007 Contractor: Carr And Duff Co Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Completed | Completion date: May 27, 2010 | Permit id: 95249 | |||||
SCORE 99 T. C. O. Date: August 9, 2007 Contractor: L F Driscoll Co Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Completed | Completion date: August 20, 2007 | Permit id: 94535 | |||||
SCORE 99 Tenant fit-out on floors 8,9,11, and 12 Date: November 13, 2007 Contractor: L F Driscoll Co Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: February 20, 2008 | Permit id: 99728 | |||||
SCORE 70 Hvac ductwork Date: October 5, 2007 Contractor: Ssm Industries Inc Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 1, 2009 | Permit id: 99275 | |||||
SCORE 95 Construction of a 3 story addition on top of an existing 9 story building. Date: October 8, 2008 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Addition permit | Permit status: Completed | Completion date: June 16, 2011 | Permit id: 155263 | |||||
SCORE 100 Install (1) logo on bldg wall 1110" x 16 9 1 4" illuminated, & (1) logo on bldg wall 2 3 1 8" x 3 2 1 2" non illuminated Date: July 8, 2011 Contractor: City Sign Service Inc Client: Childrens Hospital Of Ph | Permit type: Sign permit | Permit status: Completed | Completion date: October 24, 2011 | Permit id: 346756 | |||||
SCORE 100 Install new conduit and communication system for 24 volt animal watering and vlp equipment (west dist) Date: September 14, 2007 Contractor: Liberty Integrated Solutions Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Expired | Completion date: September 14, 2007 | Permit id: 96028 | |||||
SCORE 100 Fit out for b level mechanical Date: September 6, 2017 Contractor: Wm J Donovan Co Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Active | Completion date: November 6, 2017 | Permit id: 789813 | |||||
SCORE 100 Alterations to existing hvac system in the biomed labs on level p1 of the buerger care center as per approved plans. Date: July 26, 2017 Contractor: A T Chadwick Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Active | Completion date: July 26, 2017 | Permit id: 796712 | |||||
SCORE 100 For the installation of an automatic sprinkler system in accordance with nfpa 13 connecting to the existing system for the rest of the building, within the p1 level of an existing medical facility, as per plans and pa dept. Of health approval (see second sheet for doh approval). Date: August 30, 2017 Contractor: Oliver Sprinkler Co Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Completed | Completion date: November 10, 2017 | Permit id: 796781 | |||||
SCORE 100 For the installation of a fire suppression system as per nfpa 13 to the 9th floor of an existing health facility serviced by an exisitng six inch fire service line with a backflow preventer assembly and fire pump. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Fire suppression system to be installed in accordance with nfpa 13. Date: October 19, 2017 Contractor: Independence Fire Sprinkler Co Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Active | Completion date: November 9, 2017 | Permit id: 797121 | |||||
SCORE 100 For the installtion of four (4) air handling unit, one (1) fan coil unit, nine reheat coils, and chilled hot water piping only. No new ductwork or registers or diffusers on this permit Date: August 21, 2017 Contractor: Limbach Company Llc Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Active | Completion date: November 6, 2017 | Permit id: 800244 | |||||
SCORE 100 Remove exiting security camera, relocate and install new camera abd new catagory 6 data cables. Supply one extron power supply as per plan per 2008 nec. Date: September 26, 2017 Contractor: Bluestone Communications Inc Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Completed | Completion date: November 15, 2017 | Permit id: 809475 | |||||
SCORE 100 Ammend ap# 7794 to Date: September 12, 2017 Contractor: Target Building Construction Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Active | Completion date: October 4, 2017 | Permit id: 814997 | |||||
SCORE 100 Ammend ap# 776384 to reflect correct address. (incorrect submitted address 3401 civic center blvd) correct address is 35 civic center blvd. Date: September 12, 2017 Contractor: Target Building Construction Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Active | Completion date: October 4, 2017 | Permit id: 814988 | |||||
SCORE 100 Shelter platform permit- erection of a sidewalk shelter platform as per engineered plans. Streets department permit required for sidewalk closure prior to the start of work. Date: September 7, 2017 Contractor: Superior Scaffold Services Inc Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Active | Completion date: October 23, 2017 | Permit id: 814242 | |||||
SCORE 100 Demo of an existing nurses station including removal of millwork, drywall partitions and nurse call system. Construction of a new gypsum wall board partition for the expansion of a pump room including floor finishes, new ceiling, a new dialysis system including pump room equipment dialysis. Separate permits required for m. E. P. S. Date: October 3, 2017 Contractor: Target Building Construction Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Active | Completion date: November 10, 2017 | Permit id: 817905 | |||||
For the reconfiguration of a loading dock and the erection of a partially enclosed roof for the loading dock over an existing three four story below grade structure as part of an existing research facility (size and location as shown on the application) Date: March 24, 2008 Client: Childrens Hospital Of Ph | Permit type: Zoning permit | Permit status: Completed | Completion date: February 1, 2013 | Permit id: 82340 | |||||
SCORE 100 Install 8 water closet,15 lavs, 1 mop receptor, 3 sinks, 1 open site drain, 7 bath tubs Date: June 27, 2011 Contractor: Burns Mechanical Inc Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 22, 2011 | Permit id: 345928 | |||||
SCORE 100 For the installation of a fire suppression system, in the chop bcc penthouse, in accordance with nfpa 13, to tie into existing system, as per approved plans. Date: May 3, 2017 Contractor: Oliver Sprinkler Co Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Active | Completion date: November 3, 2017 | Permit id: 757826 | |||||
SCORE 95 For an interior fitout of level b on the colker building for research accessory to health facility to include the erection of partition walls, provide finishes and furnishings throughout. Building is fully sprinklered. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Amended permits required for special inspections separate permits required for all other work. Date: April 7, 2017 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Active | Completion date: September 27, 2017 | Permit id: 757930 | |||||
SCORE 99 Fit out 4 floors of shell space to become patient treatment areas. New receptacles,new lighting and lighting control per 2008 nec (health care)new fire alarm throughout per nfpa 72 Date: March 31, 2017 Contractor: J P Rainey And Co Inc Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Expired | Completion date: March 31, 2017 | Permit id: 760750 | |||||
SCORE 100 For the installation of a soffit enclosure to enclose medical oxygen supply line being installed in an existing health facility. All work to be done per approved plans stamped off by doh. If field conditions vary contact design professional prior to the start of any work. Separate permtis required for all other work. Date: April 3, 2017 Contractor: Target Building Construction Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: September 29, 2017 | Permit id: 761589 | |||||
SCORE 100 Installation of automatic wet sprinkler system with associated pendent upgright heads and piping in accordance with nfpa 13 throughout levels 9 through 12 of a newly constructed high rise hospital addition. This system will tie in to an existing system with fire pump at the 8th floor pressure reducing valve on the standpipe. Extension of standpipes in accordance with nfpa 14. Separate permits required for any electrical or plumbing work. Date: July 5, 2017 Contractor: Independence Fire Sprinkler Co Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Active | Completion date: November 6, 2017 | Permit id: 767144 | |||||
SCORE 95 Furnish and install light fixtures, receptacles and associated hospital facility care cable. Conduit and wire. Furnish and install 200amp panel board and all associated conduit and feeders to existing 225 amp spare circuit breaker as per nec 2008 (health care) Date: June 26, 2017 Contractor: Hatzel And Buehler Inc Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Completed | Completion date: October 2, 2017 | Permit id: 782612 | |||||
SCORE 100 Alteration: interior plumbing for the fit-out of level p1 of the chop-buerger center-osmo eh & s area. Install (1)sk-a sink with related supply,sanitary drains and vent piping (health care facility). The installation shall comply with the philadelphia plumbing code, 2004. Date: June 21, 2017 Contractor: A T Chadwick Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 10, 2017 | Permit id: 783950 | |||||
SCORE 100 For the installation of a mechanical system to include registers diffusurs, piping work, supports, ductwork, and all other work as per approved plans. All work shall be in accordance with doh approval. Separate permit required for any mep and fire suppression work. Date: June 1, 2017 Contractor: A T Chadwick Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 10, 2017 | Permit id: 783959 | |||||
SCORE 95 Level ii interior alterations (no change of occupancy) to include the revision to the ultra sound area on level two and build out shell area on level three for a day medicine unit as per approved plans and pa doh approvals. Building fully sprinklered. Separate permits required for any mep or fire suppression work Date: June 26, 2015 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: October 13, 2015 | Permit id: 611649 | |||||
SCORE 95 Fit-out for pet mri @ 2nd floor of ambulatory care center. Date: May 20, 2015 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: October 23, 2015 | Permit id: 607181 | |||||
SCORE 100 Alteration: interior plumbing for level b of the colker translational research building, which is accessory to a health care facility (chop). The work shall comply with the phialdelphia plumbing code, 2004. Fuel gas, medical gas,compressed air & vacumm piping and equipment is not part of this permit and requires a mechanical permit. Date: July 5, 2017 Contractor: Limbach Company Llc Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Active | Completion date: September 27, 2017 | Permit id: 775450 | |||||
SCORE 100 Install automatic sprinkler system Date: July 9, 2008 Contractor: Majek Fire Protection, Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Completed | Completion date: October 15, 2009 | Permit id: 158852 | |||||
SCORE 100 Installing branch power wiring from existing panels to receptacles, switches, light fixtures & kitchen equipment. Not installing service, feeders, panels, f a, elevator or any other low voltage equipment. Date: July 22, 2008 Contractor: Gordon Group Electric Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Completed | Completion date: May 20, 2010 | Permit id: 165128 | |||||
SCORE 91 Install "fire alarm fm2 system panel" and devices per plans and codes as per nfpa-72 (west dist) Date: July 7, 2009 Contractor: Adams Electrical Construction Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Completed | Completion date: June 15, 2010 | Permit id: 187775 | |||||
SCORE 100 Install fire sprinklers to level 7 and 8 as per fire protection drawings Date: December 5, 2008 Contractor: Majek Fire Protection, Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Completed | Completion date: March 24, 2010 | Permit id: 184668 | |||||
Interior renovations Date: October 3, 2008 Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: May 8, 2009 | Permit id: 178004 | |||||
SCORE 100 Throughout new research facility, continuation of electrical work for power and distribution phase ii and phase iia project. Work levels 1 through 12 includes generator relocations, 2 new unit sub-stations, power distribution to major mechanical equipment rated 20-25hp and higher. Date: November 26, 2008 Contractor: Carr And Duff Co Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Completed | Completion date: December 27, 2010 | Permit id: 167055 | |||||
SCORE 100 Installation of a clean agent automatic fire suppression system Date: January 21, 2009 Contractor: Suppression Systems Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Completed | Completion date: February 1, 2010 | Permit id: 192816 | |||||
SCORE 78 Operations permit for the use of explosives at the chop ambulatory care center. No transport permit required less than 1,0 lbs. Blasting to be in accordance with the submitted blast plan. Date: June 10, 2011 Contractor: Ed Wean Drilling Blasting Cont Client: Childrens Hospital Of Ph | Permit type: Operations permit | Permit status: Completed | Permit id: 21081 | |||||
SCORE 78 Operations permit for the use of explosives at the chop ambulatory care center. No transport permit required less than 1,0 lbs. Blasting to be in accordance with the submitted blast plan. Date: April 2, 2012 Contractor: Ed Wean Drilling Blasting Cont Client: Childrens Hospital Of Ph | Permit type: Operations permit | Permit status: Completed | Permit id: 21507 | |||||
SCORE 100 Install sprinkler system in levels 9, 10, 11, 12, & 13, connect to exsiting system and existing backflow assembly. Contiunation of prior fire suppression permits. Date: July 27, 2009 Contractor: Majek Fire Protection, Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Completed | Completion date: December 27, 2011 | Permit id: 222317 | |||||
SCORE 95 Tco for floors "a" plaza(partial) and 3rd & 4th per revised plans. Date: August 11, 2009 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Completed | Completion date: August 11, 2009 | Permit id: 227634 | |||||
SCORE 95 Tco for 6th floor laboratory and office space, see permits 90021,155263 Date: September 17, 2009 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Completed | Completion date: October 29, 2009 | Permit id: 231599 | |||||
SCORE 95 Tco for 4th floor laboratory and office space for 90021, 155263 Date: September 17, 2009 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Completed | Completion date: April 16, 2010 | Permit id: 231604 | |||||
SCORE 95 Tco for 5th floor laboratory and office space Date: September 17, 2009 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Administrative permit | Permit status: Completed | Completion date: October 29, 2009 | Permit id: 231605 | |||||
For the erection of a three (3) story addition above an existing nine (9) story structure with a 3 4 story below grade structure. Size and location as shown in the application. Extension of research facility, central utility plant with accessory loading area ( 5 loading spaces including 1 trash space ). Date: April 29, 2008 Client: Childrens Hospital Of Ph | Permit type: Zoning/use permit | Permit status: Completed | Completion date: January 29, 2013 | Permit id: 145490 | |||||
SCORE 99 Renovations to information services dept. Including improvements to office and storage space. Replacement of finishes and reconfigure layout to improve work stations. Date: August 10, 2011 Contractor: L F Driscoll Co Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: June 23, 2012 | Permit id: 354943 | |||||
SCORE 96 For mechanical permit-install heating hot water piping for fin tube radiation and reheat coils on vav boxes as per plans. Date: January 11, 2017 Contractor: Binsky And Snyder Llc Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Active | Completion date: November 6, 2017 | Permit id: 741420 | |||||
SCORE 96 Interior plumbing alterations on floors 9 thru 12 for a fit-out of an ambulatory health care facility (the childrens hospital of philadelphia - buerger center phase 2a) - installation will comply with the approved plans and the philadelphia plumbing code 2004 - medical gas vacuum systems shall comply with chapter 12 of the 2009 international plumbing code - medical gases vacuum systems shall be designed installed per nfpa 99c and vacuum system terminations shall comply with the 2009 international mechanical code - oxygen systems shall designed installed per nfpa & nfpa 51 Date: January 19, 2017 Contractor: Binsky And Snyder Llc Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Active | Completion date: November 6, 2017 | Permit id: 741426 | |||||
SCORE 99 Alterations to hvac system on level p1 of an existing medical facility (buerger center) as per approved plans. Date: January 6, 2017 Contractor: A.T. Chadwick Company Inc Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 21, 2017 | Permit id: 743152 | |||||
SCORE 95 For the erection of a temporary trailer with accessible ramp to be used for construction and administrative offices as part of an existing hospital. Separate permits required for mechanical, electrical, and plumbing systems. Date: February 2, 2017 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: November 20, 2017 | Permit id: 743475 | |||||
SCORE 100 For a tenant fit-out to create an office space in an existing medical facility. Building shall be fully sprinklered. Work to include interior non-bearing partitions, millwork, and finishes. All work to be completed in accordance with pennsylvania dept. Of health approved plans. Date: January 6, 2017 Contractor: Target Building Construction Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Active | Completion date: November 10, 2017 | Permit id: 744968 | |||||
SCORE 99 Installation of electrical in the infrastructure to support future fit out of floors 9-12. New substation, bus duct risers, panel boards, transformers & feeders to mechanical equipment per 2008 nec (health care) new fire alarm risers, panels & devices per nfpa 72 Date: February 14, 2017 Contractor: J P Rainey And Co Inc Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Expired | Completion date: February 14, 2017 | Permit id: 747026 | |||||
SCORE 62 Demolition and installation of hvac system throughout floors 9-12 of chop cuerger center for advanced pediatric care as per approved plans. Date: February 24, 2017 Contractor: Edward J Deseta Company Inc Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Active | Completion date: November 6, 2017 | Permit id: 746651 | |||||
SCORE 99 107 new lighting fixtures & switches, 60-new receptacles, 7-new furniture feeds as per nec 2008 west district & fire alarm 4-new smoke detectors, 3-new speaker strobes & relocation of existing devices as per nfpa 72 Date: February 14, 2017 Contractor: J P Rainey And Co Inc Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Completed | Completion date: August 21, 2017 | Permit id: 749506 | |||||
SCORE 100 To install 3 4" water service to temp trailers. To install 5" sanitary cabinet with trap Date: January 13, 2017 Contractor: Harry Stuhl Iii Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 3, 2017 | Permit id: 749874 | |||||
SCORE 100 Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: October 16, 2017 Contractor: Oliver Sprinkler Co Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Active | Completion date: October 16, 2017 | Permit id: 824272 | |||||
SCORE 100 Selective demolition on 7th flr. Of bueger center. Construct new partition and upgrade finsihes. Separated permit required for mechanical and electrical work. Date: November 3, 2017 Contractor: Target Building Construction Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Active | Completion date: November 29, 2017 | Permit id: 824560 | |||||
SCORE 95 Interior alterations to create research laboratories. Date: November 5, 2007 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: February 9, 2009 | Permit id: 83931 | |||||
SCORE 99 1 new light fixture, new receptacles,1 new feeder to r. O. Water processing unit per 2008 nec (health care) Date: November 16, 2017 Contractor: J P Rainey And Co Inc Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Active | Completion date: November 16, 2017 | Permit id: 824791 | |||||
SCORE 95 Construction of new structure, architectural renderings & fit out associated site work, as part of phased construction. Structural plans and framing see permit 66402. Foundation & underground construction & approvals see 23548. Date: August 9, 2007 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: New construction permit | Permit status: Completed | Completion date: June 20, 2011 | Permit id: 90021 | |||||
SCORE 99 Interior alterations, fit-out of prior existing shell space, as per plans. Date: September 13, 2007 Contractor: L F Driscoll Co Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: October 28, 2008 | Permit id: 90958 | |||||
SCORE 100 Chop south campus research phase ii from 1st to 8th fls. (wc, lav, drinking f, fl dr, mop recepts, sinks, area dr, urinals, elect water c). Date: August 13, 2007 Contractor: A T Chadwick Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Completed | Completion date: February 9, 2010 | Permit id: 91993 | |||||
SCORE 100 Install and furnish fxts for the patient care units. Lavs, wc, urinals, fl dr, mop recepts. Date: October 11, 2007 Contractor: A T Chadwick Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Completed | Completion date: February 23, 2009 | Permit id: 105553 | |||||
SCORE 88 Fit out lab space on "c" level Date: October 11, 2007 Contractor: A T Chadwick Co Inc Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 31, 2015 | Permit id: 103465 | |||||
SCORE 95 Level ii alterations (no change of occupancy) to area 5 of the ctrb building for mechanical and electrical service expansion to facilitate buerger care center expansion project as well as the cup b level vivarium project as per approved plans. Work is to accomodate electrical gear, generator, chillers, pumps and new cooling towers on the roof to include installation of steel dunnage on roof to support cooling towers and concrete pads supporting generators. Separate permits required for mep work Date: April 3, 2017 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Active | Completion date: November 6, 2017 | Permit id: 752636 | |||||
SCORE 100 This is an over the counter permit application. We will be relocting (53) heads in the p-1 level; case management in th echop buerger center. Date: January 19, 2017 Contractor: Oliver Sprinkler Co Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Completed | Completion date: July 28, 2017 | Permit id: 752952 | |||||
SCORE 100 Phased project - level 2 alterations consisting of minor renovations to several areas including an office space on 1 level and several rooms in the rediology unit on the third fl of the main hospital - de-laminate, demo selected walls, ceilings, flooring and med systems and replace with new as per plan. Date: January 11, 2013 Contractor: L F Driscoll Company Llc Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Expired | Completion date: August 6, 2013 | Permit id: 440365 | |||||
SCORE 95 For the erection of core & shell of a four (4) story addition w. Rooftop mechanical penthouse above previously approved high-rise ambulatory care center (acc) building of protected non-combustible concrete steel construction with exterior glazed curtain wall system; building is to be fully sprinklered. All work permitted herein limited to erection of building envelope & superstructure only; separate fit-out & certificate of occupancy permits required prior to occupancy. Date: April 18, 2013 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Addition permit | Permit status: Completed | Completion date: October 15, 2015 | Permit id: 450090 | |||||
SCORE 100 Tie into existing building fire alarm system as per nec 2008 & nfpa 72 Date: May 31, 2013 Contractor: H B Frazer Co Penna Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Expired | Completion date: May 31, 2013 | Permit id: 454430 | |||||
SCORE 95 Install normal and emergency 15kv switchgear, generator panels and feeders for new chillers, cooling towers air handling units pumps and ats as per 2008 nec (west district) Date: April 27, 2017 Contractor: Hatzel And Buehler Inc Client: Childrens Hospital Of Ph | Permit type: Electrical permit | Permit status: Expired | Completion date: April 27, 2017 | Permit id: 771311 | |||||
SCORE 100 This is an over the counter permit application. We will be relocating (12) heads in the p-1 level; corridor in the chop buerger center. Date: January 19, 2017 Contractor: Oliver Sprinkler Co Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Active | Completion date: September 19, 2017 | Permit id: 752950 | |||||
SCORE 99 Tenant fit-out on floors 5-7, sw tower (area north of stair b is not included in this permit) Date: September 27, 2007 Contractor: L F Driscoll Co Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: November 20, 2008 | Permit id: 103780 | |||||
SCORE 99 Hvac on 5th, 6th & 7th flrs. Date: October 24, 2007 Contractor: A.T. Chadwick Company Inc Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 14, 2011 | Permit id: 107231 | |||||
SCORE 100 Install an automatic sprinkler system. Date: August 10, 2009 Contractor: Majek Fire Protection, Inc Client: Childrens Hospital Of Ph | Permit type: Suppression permit | Permit status: Completed | Completion date: September 29, 2010 | Permit id: 165499 | |||||
SCORE 100 Shell space fitout in level p1 of buerger center Date: October 3, 2017 Contractor: Target Building Construction Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Active | Completion date: November 29, 2017 | Permit id: 815382 | |||||
SCORE 99 Installation of ductwork, registers diffusers, mechanicals, piping and all incidental ductwork items. Separate permit(s) with special inspections required for smoke control systems stairway pressurization prior to certificate of completion. Permit holders file number: co-0498. 0499. 0500. 0501 Date: March 13, 2013 Contractor: S S M Industries, Inc Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 15, 2015 | Permit id: 437415 | |||||
SCORE 95 Erection of structural steel frame and metal panel wall to provide screening for existing mechanical equipment and cooling towers as per approved plans. Construction on existing plaza, see permit 404496 for construction of adjacent building. Date: June 18, 2015 Contractor: Turner Construction Company Client: Childrens Hospital Of Ph | Permit type: Alteration permit | Permit status: Completed | Completion date: May 28, 2016 | Permit id: 610164 | |||||
SCORE 100 Alterations to an existing mechanical system for a medical facility to include vavs,register,diffusers,ductwork, and associated supply return piping. All work shall be done in accordance with doh approval. Date: December 5, 2017 Contractor: A T Chadwick Client: Childrens Hospital Of Ph | Permit type: Mechanical permit | Permit status: Active | Completion date: December 8, 2017 | Permit id: 826289 | |||||
SCORE 100 Furnish and install drain and supply piping to 1 sink with faucet (health care) Date: December 5, 2017 Contractor: A T Chadwick Client: Childrens Hospital Of Ph | Permit type: Plumbing permit | Permit status: Active | Completion date: December 8, 2017 | Permit id: 826291 |