ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 93 Hvac change out - package system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: July 11, 2016 Contractor: Sherlock Heating And Air Conditioning IncPermit type: Mechanical - hvac change out | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 71 4600sf reroof for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material asphalt shingles proposed roofing material asphalt shingles manufacturer certainfeed brand and model land mark solaris color (if cool roof required) aged cedar built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Misc. (antennas, tennis cts, gazebo) | Permit status: Completed | Permit id: Pds2016-Resalt- | Parcel: 1812803800 | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 12, 2016 Contractor: Asgard ElectricPermit type: Res roof mt solar pv | Permit status: Completed | Permit id: Pds2016-Resalt- |