Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Moss, alan Date: February 11, 2013 Permit status: Closed | Permit id: 13-00650 | |||||
SCORE 100 Moss, alan Client: Moss, Alan | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 13-00650 | Parcel: 20140 | |||||
SCORE 96 Moss, alan Client: Moss, Alan | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 13-00650 | Parcel: 20140 | |||||
SCORE 100 Moss, alan Client: Moss, Alan | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 13-00650 | Parcel: 20140 | |||||
January 31, 2013 9:43:46 am rhurley. Received application to replace mobile home in existing park with new model; two 4x4 landings;rlh; february 11, 2013 4:44:38 pm heatherr. Received application to replace mobile home in existing park with new model;two 4x4 landings; har; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hoo Permit type: Permits - historical | Permit status: Closed | Permit id: 13-00650 | Parcel: 20140 | |||||
Moss, alan Date: February 11, 2013 Value: $5,880 Permit type: Historical | Permit status: Closed | Permit id: 13-00650 | |||||
January 31, 2013 9:43:46 am rhurley. Received application to replace mobile home in existing park with new model; two 4x4 landings;rlh; february 11, 2013 4:44:38 pm heatherr. Received application to replace mobile home in existing park with new model;two 4x4 landings; har; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hoo Date: February 11, 2013 Permit type: Permits - historical | Permit status: Closed | Permit id: 13-00650 | Parcel: 20140 |