New construction permit Date: October 15, 2015Client: Ryan Quinn | Permit status: Completed | Permit id: 628107 | |||||
Zoning/use permit Date: July 22, 2015Client: Ryan Quinn | Permit status: Completed | Permit id: 584372 | |||||
Mechanical permit Date: January 22, 2016Client: Ryan Quinn | Permit status: Completed | Permit id: 665052 | |||||
Electrical permit Date: January 21, 2016Client: Ryan Quinn | Permit status: Expired | Permit id: 665073 | |||||
Suppression permit Date: December 3, 2015Client: Ryan Quinn | Permit status: Completed | Permit id: 651540 | |||||
Permit for the erection of an attached structure with interior garage, rear deck at second floor level (no steps to grade), partial roof deck with forty-two inch (42) guard rails and pilot house for roof deck access (pilot house not to exceed ten feet (10-0) in height) on each property. Each structure for use as a single-family dwelling with one (1) accessory off-street parking space. Sizes and locations as shown in application / plan. Date: March 13, 2015Client: Ryan Quinn | Applicant: Dawn M. Tancredi Esq | Permit type: Appeal | Permit status: Granted/prov | Completion date: April 30, 2015 | Permit id: 24792 | |||||
Plumbing permit Date: January 26, 2016Client: Quinn Ryan | Permit status: Completed | Permit id: 665708 | |||||
New construction permit Date: October 15, 2015Client: Ryan Quinn | Permit status: Completed | Permit id: 628107 | |||||
Mechanical permit Date: January 22, 2016Client: Ryan Quinn | Permit status: Completed | Permit id: 665052 | |||||
Electrical permit Date: January 21, 2016Client: Ryan Quinn | Permit status: Expired | Permit id: 665073 | |||||
Zoning use permit Date: July 22, 2015Client: Ryan Quinn | Permit status: Completed | Permit id: 584372 | |||||
Suppression permit Date: December 3, 2015Client: Ryan Quinn | Permit status: Completed | Permit id: 651540 | |||||
Permit for the erection of an attached structure with interior garage, rear deck at second floor level (no steps to grade), partial roof deck with forty-two inch (42) guard rails and pilot house for roof deck access (pilot house not to exceed ten feet (10-0) in height) on each property. Each structure for use as a single-family dwelling with one (1) accessory off-street parking space. Sizes and locations as shown in application plan. Date: March 13, 2015Client: Ryan Quinn | Applicant: Dawn M. Tancredi Esq | Permit type: Appeal | Permit status: Granted/prov | Completion date: April 30, 2015 | Permit id: 24792 | |||||
SCORE 99 Install 200amp service,complete wire of house to include recepts,outlets,switches,fixtures,smokes and co detectors as per 2008 nec (east district) Date: January 21, 2016 Contractor: J M L Electric IncPermit type: Electrical permit | Permit status: Expired | Completion date: January 21, 2016 | Permit id: 665073 | |||||
SCORE 89 Installation of (1) hvac unit (including ductwork and associated accessories). Sfd Date: January 22, 2016 Contractor: Modern Air Solutions IncPermit type: Mechanical permit | Permit status: Completed | Completion date: May 17, 2016 | Permit id: 665052 | |||||
SCORE 100 For the installation of a nfpa 13d fire supression system for a single family dwelling serviced by a 1 inch combined fire service line and a water meter assembly. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Fire suppression system to be installed in accordance with nfpa 13d. Separate permits required for all other work. Date: December 3, 2015 Contractor: Elite Fire ProtectionPermit type: Suppression permit | Permit status: Completed | Completion date: May 17, 2016 | Permit id: 651540 | |||||
Construction of a new three story sfd with roof top deck and enclosed stair tower. Date: October 15, 2015Permit type: New construction permit | Permit status: Completed | Completion date: May 17, 2016 | Permit id: 628107 | |||||
New construction of an attached structure, one story wood framed sfd, interior garage for one vehicle, flat roof, upper level roof deck accessed from pilot house and full cellar. Date: July 22, 2015Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 22, 2015 | Permit id: 584372 | |||||
Plumbing permit Date: March 7, 2016Client: Quinn Ryan | Permit status: Completed | Permit id: 674667 | |||||
SCORE 100 Install new 5" lateral,curb trap, fai and sewer into house and new 1"combo water service-pa1#20160671160-"self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: March 7, 2016 Contractor: Cullinan Plumbing And Heating LlClient: Ezoua Louise Aka Phan Quoc Michael | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 26, 2016 | Permit id: 674667 | |||||
SCORE 100 Install new drain and water lines for: 3- toilets, 3- vanities, 2- tub showers, kitchen sink, washing machine drain Date: January 26, 2016 Contractor: Cullinan Plumbing And Heating LlClient: Ezoua Louise Aka Phan Quoc Michael | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 17, 2016 | Permit id: 665708 |