ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Date: March 13, 2009Client: Smith Aidan Budo Rezarta | Permit status: Completed | Permit id: 205034 | |||||
Plumbing permit Date: February 19, 2009Client: Smith Aidan Budo Rezarta | Permit status: Completed | Permit id: 201805 | |||||
Alteration permit Date: February 18, 2009Client: Smith Aidan Budo Rezarta | Permit status: Completed | Permit id: 201548 | |||||
Mechanical permit Date: March 3, 2009Client: Smith Aidan Budo Rezarta | Permit status: Completed | Permit id: 203517 | |||||
Administrative permit Date: February 19, 2009Client: Smith Aidan Budo Rezarta | Permit status: Completed | Permit id: 201829 | |||||
Administrative permit Date: February 19, 2009Client: Smith Aidan Budo Rezarta | Permit status: Completed | Permit id: 201829 | |||||
Alteration permit Date: February 18, 2009Client: Smith Aidan Budo Rezarta | Permit status: Completed | Permit id: 201548 | |||||
Electrical permit Date: March 13, 2009Client: Smith Aidan Budo Rezarta | Permit status: Completed | Permit id: 205034 | |||||
Mechanical permit Date: March 3, 2009Client: Smith Aidan Budo Rezarta | Permit status: Completed | Permit id: 203517 | |||||
Plumbing permit Date: February 19, 2009Client: Smith Aidan Budo Rezarta | Permit status: Completed | Permit id: 201805 | |||||
Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated feb. 2007. Deviations from this standard will result in the revocation of this permit and imposition of further penalties. Date: February 18, 2009Client: Smith Aidan Budo Rezarta | Permit type: Alteration permit | Permit status: Completed | Completion date: July 13, 2009 | Permit id: 201548 | |||||
SCORE 93 Install new water and drain lines to all fixtures, replacement of all fixtures, new stack, new main drain. Date: February 19, 2009 Contractor: Total Mechanical Concepts IncClient: Smith Aidan Budo Rezarta | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 8, 2009 | Permit id: 201805 | |||||
Amend a p-201458 to reflect two family dwelling repairs to exterior steps replace windows same size and location replace cabinetry and other cosmetic repairs must maintain all required fire separations Date: February 19, 2009Client: Smith Aidan Budo Rezarta | Permit type: Administrative permit | Permit status: Completed | Completion date: June 23, 2009 | Permit id: 201829 | |||||
Install (1) heater for 1st-floor,70,0 btus @80% in basement with duct-work including a c,condenser on roof. Install (1) heater for 2nd-floor in 2nd-floor utility room,with related duct-work,including a c condenser on roof. 70,0 btus @90%. Date: March 3, 2009Client: Smith Aidan Budo Rezarta | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 15, 2009 | Permit id: 203517 | |||||
Repair replace concrete porch floor reduce window to approx. 16"x32" - using studs, sheathing, stucco, insulation, etc. Close kitchen window in same manner Date: March 5, 2009Client: Smith Aidan Budo Rezarta | Permit type: Alteration permit | Permit status: Completed | Completion date: June 25, 2015 | Permit id: 203878 | |||||
SCORE 100 2 amp service. 3-gang meter socket (house, first and second floors), 1-1 amp panel, 2- sub-panels (100). Wiring throughout.... In accordance with 2005 nec Date: March 13, 2009 Contractor: Anthony S. Rachuba JrClient: Smith Aidan Budo Rezarta | Permit type: Electrical permit | Permit status: Completed | Completion date: August 28, 2009 | Permit id: 205034 |