Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Terminal transload operation Applicant: Tupper, James | Permit type: Construction | Permit id: 6086455 | |||||
Project cancelled per customer request lfd 5/25/20 project cancelled construct new 2-story cold storage warehouse structure with accessory offices at south end of port of seattle terminal 25 per plan (shell & core only this permit). Mup approved under pts #2409588 Date: June 28, 2006 Value: $23,991,375 Applicant: Blinstrub, Matthew | Permit type: Construction | Permit status: Cancelled | Current use: Commercial | Permit id: 6063091 | |||||
Terminal transload operation Applicant: Tupper, James | Permit type: Construction | Permit id: 6086455 | |||||
SCORE 95 Lfd 8 5 20 ltr sent lfd 8 5 20 project cancelled per the 2006 sbc section 106. 6. 7 shoreline exemption request for t25 south site improvement (phase i) for 1. 7 acres Applicant: Blinstrub, Matthew | Permit type: Construction | Permit status: Cancelled | Current use: Commercial | Permit id: 6174216 | |||||
SCORE 56 Project cancelled per customer request lfd 5 25 20 project cancelled construct new 2-story cold storage warehouse structure with accessory offices at south end of port of seattle terminal 25 per plan (shell & core only this permit). Mup approved under pts #2409588 Date: June 28, 2006 Value: $23,991,375 Applicant: Blinstrub, Matthew | Permit type: Construction | Permit status: Cancelled | Current use: Commercial | Permit id: 6063091 | |||||
Terminal transload operation Applicant: Tupper, James | Permit type: Construction | Permit id: 6086455 | |||||
SCORE 95 Installation of three, free standing replacement pillings. Date: September 24, 2008 Contractor: Port Of Seattle Engineering Applicant: Blomberg, George | Permit type: Construction | Permit status: Permit closed | Completion date: September 24, 2008 | Expiration date: March 24, 2010 | Current use: Industrial | Permit id: 6190253 | |||||
SCORE 56 Site grading, soil densification,and temorary erosion control and utility installation for future construction of storage chill facility and public refrigerated warehouse and marine operations center at terminal 25, per plan. Applicant: Grant, Jennifer | Permit type: Site development | Permit status: Inspections added | Expiration date: March 15, 2008 | Current use: Commercial | Permit id: 6094491 | |||||
SCORE 95 Closed as incomplete - expired permit construct segmented block retaining wall and cut-off wall to retain structural fill for future construction of cold storage facility, per plan. Applicant: Allen, Larry | Permit type: Construction | Permit status: Permit closed | Expiration date: March 15, 2008 | Current use: Commercial | Permit id: 6094511 | |||||
Closed as incomplete - expired permit demolition of 9 existing buildings for future construction of cargo terminal (m4-6, w1-6) per plans (mup #2400789) Date: June 2, 2005 Applicant: Peters, Deanna | Permit type: Construction | Permit status: Permit closed | Expiration date: December 2, 2006 | Permit id: 750941 | |||||
Closed as incomplete - expired permit container cargo pier crane rail + fender maintenance/restoration and security fencing replacement at terminal 25 port of seattle per pln Date: April 15, 2005 Applicant: Allen, Larry | Permit type: Construction | Permit status: Permit closed | Expiration date: October 15, 2006 | Permit id: 749805 | |||||
SCORE 100 Day get started for branch circuits only, plan review permit under no. 6525529. Date: March 23, 2016 Contractor: Foy Group Corporation Permit type: Electrical | Permit status: Permit closed | Completion date: April 6, 2016 | Expiration date: April 23, 2016 | Current use: Industrial | Permit id: 6525538 | |||||
SCORE 100 Install (6) antennas for container location Date: July 25, 2008 Contractor: S H J Electric Company Inc Permit type: Electrical | Permit status: Permit closed | Completion date: February 11, 2010 | Expiration date: July 25, 2009 | Current use: Industrial | Permit id: 6189123 | |||||
SCORE 99 Replacing conduit to lightpoles & replace poles & fixtures. Phase i Permit type: Electrical | Permit status: Permit closed | Completion date: May 24, 2010 | Expiration date: September 5, 2009 | Current use: Commercial | Permit id: 6189106 | |||||
SCORE 100 Relocate (9) reefer stands and (2) distribution panels Permit type: Electrical | Permit status: Permit finaled | Completion date: November 7, 2007 | Expiration date: September 26, 2008 | Current use: Industrial | Permit id: 6153023 | |||||
SCORE 98 Install (2) light poles #11 and #11a at terminal 25 Date: June 14, 2007 Contractor: Dalton Electric Company Permit type: Electrical | Permit status: Permit finaled | Completion date: September 12, 2007 | Expiration date: June 13, 2008 | Current use: Industrial | Permit id: 6143116 | |||||
SCORE 100 Run 4 volt feeder for transformer and trailer service Date: September 14, 2005 Contractor: S H J Electric Company Inc Permit type: Electrical | Permit status: Permit finaled | Completion date: September 15, 2005 | Expiration date: September 14, 2006 | Current use: Industrial | Permit id: 6072290 | |||||
SCORE 98 Installing kva ups Date: September 9, 2005 Contractor: Computer Power And Service Inc Permit type: Electrical | Permit status: Permit finaled | Completion date: September 14, 2005 | Expiration date: September 9, 2006 | Current use: Commercial | Permit id: 6071850 | |||||
SCORE 100 Install (5) t-stats + 1 hour investigation fee due to stop work per jessen Date: August 31, 2005 Contractor: Shawn Tuthill Permit type: Electrical | Permit status: Permit finaled | Completion date: September 9, 2005 | Expiration date: August 31, 2006 | Current use: Commercial | Permit id: 6071075 | |||||
SCORE 100 Transform 480v power to 110v power for electronic equipment Date: July 25, 2005 Contractor: S H J Electric Company Inc Permit type: Electrical | Permit status: Permit finaled | Completion date: September 19, 2005 | Expiration date: July 25, 2006 | Current use: Industrial | Permit id: 6067086 | |||||
SCORE 95 Installation of road cable fiber (approximate 4000) between buildings and light poles on site for pole mounte cameras and wireless devices + 6hours inspection time per jessen. Date: July 22, 2005 Contractor: Teknon Corporation Permit type: Electrical | Permit status: Permit finaled | Completion date: January 7, 2008 | Expiration date: July 22, 2006 | Current use: Commercial | Permit id: 6066959 | |||||
SCORE 99 1 hour inspection for disconnect/reconnection of existing lighting - per inspector jessen Date: July 14, 2005 Contractor: Port Of Seattle Seaport Maint Permit type: Electrical | Permit status: Permit finaled | Completion date: July 19, 2005 | Expiration date: July 14, 2006 | Current use: Industrial | Permit id: 6061710 | |||||
SCORE 100 Installation of a clean agent system - novec 1230 Date: July 25, 2005 Contractor: Fire Chief Equipment Co Inc Permit type: Electrical | Permit status: Permit finaled | Completion date: August 25, 2005 | Expiration date: July 25, 2006 | Current use: Commercial | Permit id: 6061664 | |||||
SCORE 94 Voice data cabling install. Date: July 8, 2005 Contractor: Baywest Multitech Comm Permit type: Electrical | Permit status: Permit finaled | Completion date: August 19, 2005 | Expiration date: July 8, 2006 | Current use: Commercial | Permit id: 6061258 | |||||
SCORE 95 Adding 4 copier recept, 2 appliance recept, & 4 general purpose receptacle - change out 12 light fixtures. Date: June 17, 2005 Contractor: Sinder Electric Incorporated Permit type: Electrical | Permit status: Permit finaled | Completion date: September 9, 2005 | Expiration date: June 17, 2006 | Current use: Commercial | Permit id: 6059986 | |||||
SCORE 95 Hook up 150kw generator for temp power - proj #2409588, ok by mccormick Date: May 25, 2005 Contractor: Sinder Electric Incorporated Permit type: Electrical | Permit status: Permit finaled | Completion date: May 27, 2005 | Expiration date: May 25, 2006 | Current use: Industrial | Permit id: 6058540 | |||||
SCORE 94 Install voice & data cabling Date: May 19, 2005 Contractor: Baywest Multitech Comm Permit type: Electrical | Permit status: Permit finaled | Completion date: September 9, 2005 | Expiration date: May 19, 2006 | Current use: Commercial | Permit id: 6058138 | |||||
SCORE 95 Replace exisitng control panel Date: May 17, 2005 Contractor: Adt Security Services Inc Permit type: Electrical | Permit status: Permit finaled | Completion date: August 3, 2005 | Expiration date: May 17, 2006 | Current use: Commercial | Permit id: 6057930 | |||||
SCORE 99 Temp power for construction trailers at port of seattle; bldg proj 2409588 Date: May 5, 2005 Contractor: Elcon Corporation Permit type: Electrical | Permit status: Permit finaled | Completion date: May 23, 2005 | Expiration date: May 5, 2006 | Current use: Commercial | Permit id: 6057110 | |||||
SCORE 100 Install fused disconnect and run power down to 2 hp motor along waterway bulkhead (2) locations total. Date: August 13, 2004 Contractor: Holmes Electric Company Permit type: Electrical | Permit status: Permit finaled | Completion date: August 16, 2004 | Expiration date: August 13, 2005 | Current use: Commercial | Permit id: 6040634 | |||||
SCORE 95 T25 south site improvements (phase ii): shoreline substantial development application to allow improvements to the southern 11. 3 acres of the marine cargo terminal at the port of seattle (terminal 25). Project includes 54,5 cu. Yds. Of grading and repaving, replacement of drainage, water, electrical and lighting systems. Surface parking for vehicles to be provided. Determination of non-significance has been prepared by the port of seattle. Date: November 24, 2008 Contractor: Port Of Seattle Engineering Applicant: Blinstrub, Matthew | Permit type: Sepa threshold determination, shoreline development | Permit status: Permit issued | Current use: Institutional | Permit id: 3009173 | |||||
SCORE 100 New sewer connection to city sewer Date: June 27, 2005 Contractor: Budget Sewer Applicant: Budget Sewer | Permit type: Side sewer | Permit status: Permit finaled | Completion date: May 20, 2008 | Expiration date: September 27, 2005 | Current use: Industrial | Permit id: 6060554 | |||||
SCORE 71 Install additional side sewer Date: May 20, 2005 Contractor: Matt Matsumoto Applicant: Matt Matsumoto | Permit type: Side sewer | Permit status: Permit finaled | Completion date: July 16, 2008 | Expiration date: August 20, 2005 | Current use: Industrial | Permit id: 6058290 | |||||
SCORE 66 New sediment management facility for transloading dredged materials. Drainage water & contaminated storm water collected and treated by settling, filtration & carbon adsorption before discharge to sanitary sewer. Epa consent decree see ckh Date: November 19, 2003 Contractor: Wilder Construction Company Applicant: Wilder Construction Company | Permit type: Side sewer | Permit status: Permit finaled | Completion date: June 29, 2007 | Expiration date: February 19, 2004 | Current use: Industrial | Permit id: 6025839 | |||||
SCORE 100 Stormwater utility upgrades. New substation and new power to pump station. 10 07 16 cep; revision to the original scope. Removed the (2) 225 amp feeds and now only supplying (1) 4 amp feed. No change in value. Permit type: Electrical | Permit status: Permit issued | Expiration date: April 6, 2017 | Current use: Industrial | Permit id: 6525529 | |||||
Closed as incomplete - expired permit container cargo pier crane rail + fender maintenance restoration and security fencing replacement at terminal 25 port of seattle per pln Date: April 15, 2005 Applicant: Allen, Larry | Permit type: Construction | Permit status: Permit closed | Expiration date: October 15, 2006 | Permit id: 749805 | |||||
SCORE 56 Site grading, soil densification,and temorary erosion control and utility installation for future construction of storage chill facility and public refrigerated warehouse and marine operations center at terminal 25, per plan. Applicant: Grant, Jennifer | Permit type: Site development | Permit status: Inspections added | Expiration date: March 15, 2008 | Current use: Commercial | Permit id: 6094491 | |||||
SCORE 99 Replacing conduit to lightpoles & replace poles & fixtures. Phase i Permit type: Electrical | Permit status: Permit closed | Completion date: May 24, 2010 | Expiration date: September 5, 2009 | Current use: Commercial | Permit id: 6189106 | |||||
Terminal transload operation Applicant: Tupper, James | Permit type: Construction | Permit id: 6086455 | |||||
SCORE 56 Project cancelled per customer request lfd 5 25 20 project cancelled construct new 2-story cold storage warehouse structure with accessory offices at south end of port of seattle terminal 25 per plan (shell & core only this permit). Mup approved under pts #2409588 Date: June 28, 2006 Value: $23,991,375 Applicant: Blinstrub, Matthew | Permit type: Construction | Permit status: Cancelled | Current use: Commercial | Permit id: 6063091 | |||||
SCORE 99 1 hour inspection for disconnect reconnection of existing lighting - per inspector jessen Date: July 14, 2005 Contractor: Port Of Seattle Seaport Maint, Permit type: Electrical | Permit status: Permit finaled | Completion date: July 19, 2005 | Expiration date: July 14, 2006 | Current use: Industrial | Permit id: 6061710 | |||||
SCORE 95 T30 91 cargo cruise project. (t25 improvements) double tagged with 3006903 for (t30) improvements: shoreline substantial development to allow upgrades to terminal container cargo facility, creating one large container cargo facility of approximately 95 acres, spanning both terminals 25 and 30. Project includes remodeling of existing gatehouse, construction of 2 optical character recognition portals, a customs building and electrical substation. Surface parking for 28 vehicles to be provided. Environmental impact statement prepared by the port of seattle. Related projects at t30-3006903 and t91-3006901. Date: July 17, 2007 Contractor: Port Of Seattle Engineering Applicant: Blinstrub, Matthew | Permit type: Sepa threshold determination, shoreline development | Permit status: Permit closed | Current use: Commercial | Permit id: 3006902 | |||||
SCORE 95 Canceled per request 3 3 07 jh. Shoreline substantial development to allow restoration of container cargo facility at terminal 25 , creating one large container cargo facility of approximately 95 acres, spanning both terminals 25 and 30. Project includes remodeling of existing gatehouse, construction of 2 optical character recognition portals, a customs building and longshoremans substation. Surface parking for 198 vehicles to be provided. Environmental impact statement is being prepared by the port of seattle. Related projects at t30-3005881 and t91-3005900 Date: January 2, 2007 Contractor: Port Of Seattle Engineering Applicant: Blinstrub, Matthew | Permit type: Sepa threshold determination, shoreline development | Permit status: Cancelled | Current use: Industrial | Permit id: 3005880 | |||||
SCORE 95 T25 bridge project (t25 half) double tagged with 3004206 for north half (t30) portion of bridge. Shoreline substantial development application to demolish 16,0 sq. Ft. Cargo terminal facility and construct a 311 linear ft. Bridge and piles (port of seattle). Project includes 17,0 cu. Yds. Of grading and improvements accessory to cargo terminal. Construction of bridge and pilings at terminal is also being reviewed under project 3004206. Determination of non-significance prepared by the port of seattle. Date: November 14, 2006 Contractor: Port Of Seattle Engineering Applicant: Blinstrub, Matthew | Permit type: Sepa threshold determination, shoreline development | Permit status: Permit finaled | Current use: Industrial | Permit id: 3003725 | |||||
SCORE 100 Remove/replace existing-rooftop units. Date: August 8, 2005 Contractor: Shawn Tuthill Applicant: Shawn Tuthill | Permit type: Refrigeration | Permit status: Permit finaled | Completion date: September 20, 2005 | Expiration date: February 8, 2007 | Current use: Commercial | Permit id: 6068548 | |||||
SCORE 95 T30/91 cargo/cruise project (t25 improvements)/double tagged with 6129886 for t improvemnts: port of seattle t-25 / cargo container facility upgrades including grading + dredging, ocr portal additions, and relocated container & reefer storage slots + more per plan (review + process 2 aps under #6129886). Project # 6129885 replaces 6122817. Applicant: Blinstrub, Matthew | Permit type: Construction | Permit status: Permit closed | Completion date: June 16, 2009 | Expiration date: July 23, 2010 | Current use: Commercial | Permit id: 6129885 | |||||
SCORE 95 Cancelled - was given 1 month to reactive project 9 14 2011 jh. Shoreline substantial development application to remove existing 89,2 sq. Ft. Dock, 9 timber piles and 235 cubic yards of submerged debris and restore shoreline in an environmentally critical area (port of seattle, terminal 24 25). Project includes installation of native riparian vegetation and 1,6 cubic yards of new material (riprap, sand). Determination of non-significance prepared by the port of seattle. Date: August 4, 2008 Contractor: Port Of Seattle Engineering Applicant: Blinstrub, Matthew | Permit type: Sepa threshold determination, shoreline development | Permit status: Cancelled | Current use: Commercial | Permit id: 3008527 | |||||
SCORE 95 T25/ bridge project (t25 half)/ double tagged with 6084594 for north half (t30) portion of bridge: remove former rail barge loading facility, including in-water and over water piling structures. Grade approximately 190 cy, and construct south half of bridge over slip 27 connecting to 2775 e marginal way s. All per plans, all process and reviews for 6084595 and 6084594 tracked under 6084594. Applicant: Mach, Ticson | Permit type: Construction | Permit status: Permit closed | Completion date: September 26, 2008 | Expiration date: January 16, 2010 | Current use: Industrial | Permit id: 6084595 | |||||
Terminal transload operation Applicant: Tupper, James | Permit type: Construction | Permit id: 6086455 | |||||
SCORE 95 T24 25 habitat resteration project: the port proposes removing a derelict dock at terminal 24 at terminal 25, and making fish and wildlife habitat improvements in the 2. 1 acres of newly-exposed aquatic and shoreline area, including (1) removal of concrete pier, creosote piling, and in-water debris: (2) placement of substrate for algae growth; (3) creating of fine-granted substrate Contractor: Port Of Seattle Engineering Applicant: Blinstrub, Matthew | Permit type: Construction | Permit status: Initial information colle | Current use: Industrial | Permit id: 6165328 | |||||
SCORE 95 Port of seattle t-25 / cargo container facility upgrades including grading dredging, ocr portal additions, and relocated container & reefer storage slots more per plan (review process 2 aps under #6106088). Applicant: Lau, Chun | Permit type: Construction | Permit status: Cancelled | Current use: Commercial | Permit id: 6122817 | |||||
SCORE 95 Port of seattle / grading and drainage work for site improvements + light pole installations for cargo terminal t-25 south per plan. Applicant: Meyer, Paul | Permit type: Construction | Permit status: Permit issued | Expiration date: March 20, 2012 | Current use: Commercial | Permit id: 6180258 | |||||
SCORE 95 (cancel project per applicant request 12 31 08 slb) t 25 south phase i: prepare 1. 7 acres of site for container operations: demolish existing utilities, structures, above grade site elements; remove existing pavement; install new light poles, electrical and communication conduits, fencing, sanitary sewer, piping, valves, hydrants, etc.; provide new storm water treatment facilities, including underground water quality vaults, catch basins, manholes, and pipes; filling and grading to level site for new pavement layer; construct new facilities appurtenances for site tenant, such as portable buildings, barricades, wash racks, aisle signs, access gates, a new entrance sign, guard sheds. Value: $1 Contractor: Port Of Seattle Engineering Applicant: Blinstrub, Matthew | Permit type: Construction | Permit status: Cancelled | Current use: Industrial | Permit id: 6175394 | |||||
SCORE 95 Cancelled due to inactivity rc 1 4 17 20 sq ft of riparian improvements at north end of terminal 25. Contractor: Port Of Seattle Engineering Applicant: Blinstrub, Matthew | Permit type: Construction | Permit status: Cancelled | Current use: Industrial | Permit id: 6222727 | |||||
SCORE 94 Install voice & data cabling Date: May 19, 2005 Contractor: Baywest Communications Inc Permit type: Electrical | Permit status: Permit finaled | Completion date: September 9, 2005 | Expiration date: May 19, 2006 | Current use: Commercial | Permit id: 6058138 | |||||
SCORE 94 Voice data cabling install. Date: July 8, 2005 Contractor: Baywest Communications Inc Permit type: Electrical | Permit status: Permit finaled | Completion date: August 19, 2005 | Expiration date: July 8, 2006 | Current use: Commercial | Permit id: 6061258 | |||||
SCORE 100 Removal of (9) refer stations - for underground conduits only - ok by porter, plans need to be submitted asap 11 10 08 qn - about to expire letter sent. Date: August 20, 2007 Contractor: S H J Electric Company Inc Permit type: Electrical | Permit status: Permit closed | Completion date: March 30, 2009 | Expiration date: August 20, 2008 | Current use: Industrial | Permit id: 6150839 | |||||
SCORE 95 Rewire devices & lighting in existing 2 story building 6 17 05 mvc: change value to 30000 Permit type: Electrical | Permit status: Permit finaled | Completion date: September 9, 2005 | Expiration date: June 22, 2006 | Current use: Commercial | Permit id: 6059883 | |||||
SCORE 95 Relocate existing facp & 3 devices to new west riser house 8 17 06 jnl - about to expire letter sent Date: September 15, 2005 Contractor: Adt Security Services Inc Permit type: Electrical | Permit status: Permit closed | Completion date: January 21, 2010 | Expiration date: September 15, 2006 | Current use: Commercial | Permit id: 6072493 | |||||
SCORE 100 Install circuits for electronic and cctv equipment at inbound & outbound lanes. Install underground conduits for communications to existing light poles. + 1/2hour inspection for underground conduit installation. Date: June 9, 2005 Contractor: S H J Electric Company Inc Permit type: Electrical | Permit status: Permit finaled | Completion date: September 19, 2005 | Expiration date: June 9, 2006 | Current use: Industrial | Permit id: 6059384 | |||||
SCORE 99 Infrastructure electrical upgrades. 6 8 05 bew increased value of work by 643,649. 00 Permit type: Electrical | Permit status: Permit finaled | Completion date: August 10, 2005 | Expiration date: April 26, 2006 | Current use: Industrial | Permit id: 6055800 | |||||
SCORE 95 Relocate facp & install heat detector & outside bell. Date: December 28, 2004 Contractor: Adt Security Services Inc Permit type: Electrical | Permit status: Permit finaled | Completion date: July 27, 2005 | Expiration date: December 28, 2005 | Current use: Commercial | Permit id: 6049142 |