Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Excavate, remove existing 48" water valve and install new 48" water valve and air & drain blow off assemblies. The applicant promised to submit as built drawing after the job is complete for ddot records. All street trees within the limits of work must be protected and all excavation operations shall comply with district department of transportation standard specifications for highways and structures sections 207 and 611. All work shall be conducted so as to avoid injury to tree trunks, branches, and roots. Excavations within limits of tree root spread shall proceed with care either by use of hand tools or with equipment that will not cause tree root damage. If there are any tree conflicts on this job site permit holder must suspend all work that contributes to the conflict and immediately contact ranjit babra, ward 5 arborist at 202-507-2505 to receive clearance to continue conflicting work. ![]() ![]() Client: Dc Water | Permit type: Excavation; valves (excavation), excavation; manhole installation | Permit status: Permit expired | Expiration date: July 5, 2013 | Permit id: Pa77185 | |||||
SCORE 100 Excavate, remove existing 48" water valve and install new 48" water valve and air & drain blow off assemblies. The applicant promised to submit as built drawing after the job is complete for ddot records. All street trees within the limits of work must be protected and all excavation operations shall comply with district department of transportation standard specifications for highways and structures sections 207 and 611. All work shall be conducted so as to avoid injury to tree trunks, branches, and roots. Excavations within limits of tree root spread shall proceed with care either by use of hand tools or with equipment that will not cause tree root damage. If there are any tree conflicts on this job site permit holder must suspend all work that contributes to the conflict and immediately contact ranjit babra, ward 5 arborist at 202-507-2505 to receive clearance to continue conflicting work. ![]() ![]() Client: Dc Water | Permit type: Excavation; valves (excavation), excavation; manhole installation | Permit status: Permit expired | Expiration date: September 3, 2013 | Permit id: Pa77185-R1 | |||||
Dccr proposes to drill one geotechnical boring (nebbc-82) located at adjacent to 322 florida avenue nw. The boring will be 8 inches diameter and feet bgs, drilled by mud rotary methods. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. The boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. See idw management plan and attached schematics for additional information. ![]() Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Revise and resubmit | Expiration date: February 1, 2017 | |||||
Dccr proposes to drill one geotechnical boring (nebbc-82) located adjacent to 322 florida avenue nw. The boring will be 8 inches diameter and feet bgs, drilled by mud rotary methods. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. The work will take up to 1 week to complete and require modified work hours of 8pm-5am. The work zone will be removed and steel plates installed by 5am each morning. Work will occur monday through saturday. A dcra after-hours permit will be obtained. The work will not impact pedestrian walkways, trees or parking meters. The well shall be covered and protected from surface water drainage, to prevent the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed. The boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. See idw management plan and attached schematic ![]() Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Issued | Expiration date: February 1, 2017 | Permit id: Pa181400 | |||||
SCORE 100 Construction staging area ![]() ![]() Permit status: Expired | Expiration date: June 29, 2013 | Permit id: Pa10097192 | |||||
SCORE 100 Construction staging area ![]() ![]() Permit status: Expired | Expiration date: September 28, 2013 | Permit id: Pa10110586 | |||||
SCORE 100 Excavation; valves (excavation), excavation; manhole installation ![]() ![]() Permit status: 8 | Expiration date: September 3, 2013 | Permit id: Pa77185-R1 | |||||
SCORE 95 Construction staging area ![]() Permit status: Resubmit | Expiration date: April 6, 2017 | Permit id: 0 | |||||
SCORE 100 Excavate, remove existing 48" water valve and install new 48" water valve and air & drain blow off assemblies. The applicant promised to submit as built drawing after the job is complete for ddot records. All street trees within the limits of work must be protected and all excavation operations shall comply with district department of transportation standard specifications for highways and structures sections 207 and 611. All work shall be conducted so as to avoid injury to tree trunks, branches, and roots. Excavations within limits of tree root spread shall proceed with care either by use of hand tools or with equipment that will not cause tree root damage. If there are any tree conflicts on this job site permit holder must suspend all work that contributes to the conflict and immediately contact ranjit babra, ward 5 arborist at 202-507-2505 to receive clearance to continue conflicting work. ![]() ![]() Permit status: Permit expired | Expiration date: November 2, 2013 | Permit id: Pa77185-R2 | |||||
SCORE 100 Construction staging area ![]() ![]() Permit status: Permit expired | Expiration date: May 30, 2013 | Permit id: Pa10094837 | |||||
SCORE 95 Construction staging area ![]() Permit status: Assigned | Expiration date: April 6, 2017 | Permit id: 0 | |||||
SCORE 100 Excavate, remove existing 48" water valve and install new 48" water valve and air & drain blow off assemblies. The applicant promised to submit as built drawing after the job is complete for ddot records. All street trees within the limits of work must be protected and all excavation operations shall comply with district department of transportation standard specifications for highways and structures sections 207 and 611. All work shall be conducted so as to avoid injury to tree trunks, branches, and roots. Excavations within limits of tree root spread shall proceed with care either by use of hand tools or with equipment that will not cause tree root damage. If there are any tree conflicts on this job site permit holder must suspend all work that contributes to the conflict and immediately contact ranjit babra, ward 5 arborist at 202-507-2505 to receive clearance to continue conflicting work. ![]() ![]() Permit status: Permit expired | Expiration date: July 5, 2013 | Permit id: Pa77185 | |||||
SCORE 95 Repair gas 5x5 r/w cut o/m 31ft s of c/l of florida ave nw 2ft e of c/l of 4th st nw, 322 fla ave nw, p 639583 wr 2829742 ![]() ![]() Permit type: Excavation; repair gas service (excavation) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa121982 | |||||
SCORE 100 Dccr proposes to drill one geotechnical boring (nebbc-82) located adjacent to 322 florida avenue nw. The boring will be 8 inches diameter and feet bgs, drilled by mud rotary methods. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. The work will take up to 1 week to complete and require modified work hours of 8pm-5am. The work zone will be removed and steel plates installed by 5am each morning. Work will occur monday through saturday. A dcra after-hours permit will be obtained. The work will not impact pedestrian walkways, trees or parking meters. The well shall be covered and protected from surface water drainage, to prevent the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed. The boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. See idw management plan and attached schematic ![]() ![]() Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Issued | Expiration date: February 1, 2017 | Permit id: Pa181400 | |||||
SCORE 100 Steel plate- single location ![]() ![]() Permit status: Permit expired | Expiration date: June 14, 2013 | Permit id: Pa10100216 | |||||
SCORE 95 Construction staging area ![]() Permit status: Resubmit | Expiration date: April 6, 2017 | Permit id: 0 | |||||
SCORE 95 Permit 729428, wr 3132289. 4x5 cut repair on gas main at 322 florida ave nw. ![]() ![]() Permit type: Excavation; repair gas main line | Permit status: Permit expired | Expiration date: April 15, 2017 | Permit id: Pa200935 | |||||
SCORE 95 Construction staging area ![]() ![]() Permit status: Permit expired | Expiration date: April 16, 2016 | Permit id: Pa10233378 | |||||
SCORE 99 Construction staging area ![]() ![]() Permit status: Permit expired | Expiration date: September 26, 2016 | Permit id: Pa10335499 | |||||
SCORE 95 Construction staging area ![]() Permit status: Resubmit | Expiration date: April 6, 2017 | Permit id: 0 |