Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installing photovoltaic system on roof Date: July 28, 2015 Contractor: A And R Solar Permit type: Electrical | Permit status: Permit closed | Completion date: August 20, 2015 | Expiration date: July 27, 2016 | Current use: Single family / duplex | Permit id: 6486679 | |||||
SCORE 95 Replace furnace Date: July 30, 2009 Contractor: Washington Energy Services Co Applicant: Washington Energy Services Co | Permit type: Mechanical | Permit status: Permit issued | Expiration date: January 30, 2011 | Current use: Single family / duplex | Permit id: 6222503 |