Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Dccr proposes to drill one geotechnical boring (nebbc-77) located at adjacent to 321 florida avenue nw. The boring will be 8 inches diameter and 55 feet bgs, drilled by mud rotary methods. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. The boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. See idw management plan and attached schematics for additional information. Date: July 5, 2016 Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Revise and resubmit | Expiration date: January 15, 2017 | |||||
Dccr proposes to drill one geotechnical boring (nebbc-78) located adjacent to 321 florida avenue nw. The boring will be 8 inches diameter and 1 feet bgs, drilled by mud rotary methods. A vibrating wire piezometer will be installed at 1 feet bgs. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. No drilling spoils or excavated soils will be used as backfill. See idw management plan and attached schematics for additional information. Date: July 5, 2016 Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Revise and resubmit | Expiration date: January 15, 2017 | |||||
Dccr proposes to drill one geotechnical boring (nebbc-77) located adjacent to 321 florida avenue nw. The boring will take up to 1 week to complete and will require 24/7 occupancy of the work area. The work area will not impact sidewalks, trees or parking meters. The boring will be 8 inches diameter and 55 feet bgs, drilled by mud rotary methods. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. The boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. See idw management plan and attached schematics for additional information. Date: July 5, 2016 Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Issued | Expiration date: January 15, 2017 | Permit id: Pa180142 | |||||
Dccr proposes to drill one geotechnical boring (nebbc-78) located adjacent to 321 florida avenue nw. The boring will be 8 inches diameter and 1 feet bgs, drilled by mud rotary methods. A vibrating wire piezometer will be installed at 1 feet bgs. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. The work will take up to 1 week to complete and require modified work hours of 8pm-5am. The work zone will be removed and steel plates installed by 5am each morning. Work will occur monday through saturday. A dcra after-hours permit will be obtained. The work will not impact pedestrian walkways, trees, or parking meters. The well shall be covered and protected from surface water drainage to prevent the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed. No drilling spoils or excavated soils will be used as backfill. See idw management plan and attached sche Date: July 5, 2016 Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Issued | Expiration date: January 15, 2017 | Permit id: Pa180144 | |||||
SCORE 100 Dccr proposes to drill one geotechnical boring (nebbc-78) located adjacent to 321 florida avenue nw. The boring will be 8 inches diameter and 1 feet bgs, drilled by mud rotary methods. A vibrating wire piezometer will be installed at 1 feet bgs. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. The work will take up to 1 week to complete and require modified work hours of 8pm-5am. The work zone will be removed and steel plates installed by 5am each morning. Work will occur monday through saturday. A dcra after-hours permit will be obtained. The work will not impact pedestrian walkways, trees, or parking meters. The well shall be covered and protected from surface water drainage to prevent the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed. No drilling spoils or excavated soils will be used as backfill. See idw management plan and attached sche Date: July 5, 2016 Contractor: E2cr Inc Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Issued | Expiration date: January 15, 2017 | Permit id: Pa180144 | |||||
SCORE 99 Construction staging area Date: September 14, 2016 Contractor: E2cr C O Siva Balu Permit status: Expired | Expiration date: September 23, 2016 | Permit id: Pa10335518 | |||||
SCORE 99 Steel plate- single location Date: February 6, 2017 Contractor: Fort Myer Construction Permit status: Expired | Expiration date: February 11, 2017 | Permit id: Pa10375459 | |||||
SCORE 100 Div u - test pits at florida ave location Contractor: Dcwater Cip Permit status: Approved (pending payment | Expiration date: August 31, 2017 | Permit id: 0 | |||||
SCORE 99 Construction staging area Date: September 13, 2016 Contractor: E2cr C O Siva Balu Permit status: Permit expired | Expiration date: September 23, 2016 | Permit id: Pa10335511 | |||||
SCORE 100 Utility relocation associated with dc clean rivers/northeast boundary tunnel/division u. Per conversations with marlon smoker, dccr requires review and approval by cob 2/17/2016. Utility relocation associated with dc clean rivers/northeast boundary tunnel/division u. Per conversations with marlon smoker, dccr requires review and approval by cob 2/17/2016. Date: January 26, 2016 Contractor: Dcwater Cip Permit type: Excavation; manhole installation, excavation; sewer ml (trench), excavation; valves (excavation), excavation; vault(s) 20x each, excavation; water ml (trench) | Permit status: Permit expired | Expiration date: April 30, 2017 | Permit id: Pa122173 | |||||
SCORE 100 Dccr proposes to drill one geotechnical boring (nebbc-77) located adjacent to 321 florida avenue nw. The boring will take up to 1 week to complete and will require 24 7 occupancy of the work area. The work area will not impact sidewalks, trees or parking meters. The boring will be 8 inches diameter and 55 feet bgs, drilled by mud rotary methods. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. The boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. See idw management plan and attached schematics for additional information. Date: July 5, 2016 Contractor: E2cr Inc Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Issued | Expiration date: January 15, 2017 | Permit id: Pa180142 | |||||
SCORE 100 Excavation; boring test pit (each addl), excavation; boring test pit (single), mega projects; dc water combined sewer proj Date: March 8, 2017 Contractor: Dcwater Cip Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single), mega projects; dc water combined sewer proj | Permit status: Permit expired | Expiration date: August 31, 2017 | Permit id: Pa200840 | |||||
SCORE 100 Utility relocation associated with dc clean rivers northeast boundary tunnel division u. Per conversations with marlon smoker, dccr requires review and approval by cob 2 17 2016. Utility relocation associated with dc clean rivers northeast boundary tunnel division u. Per conversations with marlon smoker, dccr requires review and approval by cob 2 17 2016. Date: May 3, 2017 Contractor: Dcwater Cip Permit type: Excavation; manhole installation, excavation; sewer ml (trench), excavation; valves (excavation), excavation; vault(s) 20x each, excavation; water ml (trench) | Permit status: Issued | Expiration date: April 30, 2018 | Permit id: Pa122173-R1 |