Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 10-3365: revise plans for hardship. Date: November 13, 2013 Contractor: Double Woods Construction Permit status: Permit issued | Permit id: 13rev-00707 | |||||
SCORE 94 City of palo alto, msc bldg c: install (n) gas lines on the roof of msc-c, upgrade gas meter and regulator [plumbing infrastructure for future rooftop equipment] Date: July 19, 2013 Contractor: Acco Engineered Systems, Inc Permit status: Permit issued | Permit id: 13000-01899 | |||||
SCORE 67 City of palo alto, msc water meter shop: ti for existing tenant (1184 sf). Scope of work inlcudes new rooftop ac unit. New t-bar ceiling. Date: January 30, 2013 Contractor: Castlewood Construction Co Inc Permit status: Permit issued | Permit id: 13000-00300 | |||||
SCORE 86 Tenant improvement for "city of palo alto". Includes interior office reconfiguration only. Date: May 24, 2012 Contractor: J C M Construction Inc Permit status: Permit issued | Permit id: 12000-01201 | |||||
Remove existing 9kva transformer and sub-panel, install new 45kva transformer 225a panel Date: April 25, 2017 Permit status: Permit issued | Permit id: 17000-00884 | |||||
SCORE 88 Msc: replace tile in two (2) bathrooms. Replace lighting and plumbing fixtures (97 sf) Permit status: Finaled | Permit id: 17000-00132 |