Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Investigation insp recieved set of as-built plans per investigation report,not for permit, reference set only ok per d. F. Ls Date: September 4, 2012 | |||||
Meter retag-repairs Date: September 15, 2011 | |||||
SCORE 100 3d_071_meter tags | |||||
SCORE 100 3e_085a_investigation inspection |