Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Ups equipment and associated racks and batteries at existing data com room on 2nd floor ~200sf. Permit status: Permit issued | Permit id: 14000-02100 | |||||
SCORE 93 Lockheed martin: replace two (2) cooling towers and fans Permit status: Permit issued | Permit id: 14000-02330 | |||||
SCORE 80 Soil remediation system vapor recovery system. ![]() ![]() Permit status: Permit issued | Permit id: 13000-00601 | |||||
SCORE 92 Re-roof: 235 squares, class a mil tpo roofing system (overlay installation) Permit status: Permit issued | Permit id: 13000-01630 | |||||
SCORE 86 Lockheed martin: utility connections for future cleanroom. Install light fixtures, hepa filters, ceiling assembly. Anchor existing flow bench. ![]() ![]() Permit status: Permit issued | Permit id: 12000-03026 | |||||
SCORE 61 Lockheed martin: remove and replace rooftop boiler. Boiler is located behind rooftop screening. There is no increase in btus. ![]() Permit status: Permit issued | Permit id: 12000-02904 | |||||
SCORE 86 Lockheed martin: extend liquid nitrogen lines from existing chamber to three small test chambers in room 107. Replace liquid nitrogen venting line and add new vent tank on the roof. Vent tank is shorter than (e) roof screening. ![]() ![]() Permit status: Permit issued | Permit id: 12000-02726 | |||||
SCORE 59 Install (2) new liquid nitrogen tanks and associated electrical, mecahnical and plumbing. Includes concrete work. ![]() ![]() Permit status: Permit issued | Permit id: 12000-02389 | |||||
SCORE 64 Install oxygen sensor and alarms in room 113 ![]() ![]() Permit status: Permit issued | Permit id: 12000-01161 | |||||
SCORE 89 Replacement of (2) air handlers units on the roof like for like Permit status: Permit issued | Permit id: 17000-02116 |