Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 15-54; revise structural Date: January 27, 2015 Contractor: Owner Builder Permit status: Permit issued | Permit id: 15rev-00038 | |||||
SCORE 95 Extend outside air ducts on the roof to gain additional distance from the kitchen exhaust. All work below the height of the roofscreening Permit status: Permit issued | Permit id: 15000-00054 | |||||
SCORE 100 15000-02754: revision bulliten 6&7 replaced section of ramp wall w curb, revised orientation of utility communication vault, revised height of site walls and grage ramp, shifted lobby opening Date: November 29, 2016 Contractor: Devcon Construction Incorporated Permit status: Permit issued | Permit id: 16rev-00743 | |||||
SCORE 100 15000-02754: deferred submittal for curtain wall and glazing system. Date: January 6, 2017 Contractor: Devcon Construction Incorporated Permit status: Permit issued | Permit id: 17rev-00009 | |||||
SCORE 100 16000-02616: deferred submittal for the anchorage of the suspended wood ceiling Date: August 18, 2017 Contractor: Devcon Construction Incorporated Permit status: Permit issued | Permit id: 17rev-00525 | |||||
Stanford office ti ~200sf. Includes combining 2 offices for conference room on 2nd floor with associated electrical and mechanical. Date: May 1, 2014 Value: $10,000 Permit status: Permit issued | Permit id: 14000-01028 | |||||
SCORE 96 Commercial: install (1) 3" flanged horizontal seismic valve at gas service manifold. Date: April 10, 2014 Contractor: Therma Corporation Permit status: Permit issued | Permit id: 14000-00848 | |||||
SCORE 95 Sprint: modify (e) cell site on top of (e) lockheed martin building. Scope of work includes three (3) new panel antennas, six (6) new rrus, three (3) new filters, install (n) battery cabinet, gps antenna, and upgrade electric sub panel to 2 amps Date: March 29, 2013 Contractor: Overland Contracting Inc Permit status: Permit issued | Permit id: 13000-00874 | |||||
Commercial hvac replacement of (e) ton packaged rtu w (n) 2 ton split-system in same location. Date: September 10, 2013 Value: $30,000 Permit status: Permit issued | Permit id: 13000-02433 | |||||
13-914: jazz pharmaceuticals: relocate (e) ups on the second floor to the first floor Date: April 17, 2013 Permit status: Permit issued | Permit id: 13rev-00243 | |||||
T. I. For jazz phamaceuticals to create a vpod modular conference room (985 sq ft) Date: April 4, 2013 Permit status: Permit issued | Permit id: 13000-00914 | |||||
SCORE 100 15000-02754: revision bulletin 008 changes to paving and grading, call out of fire extinguisher location, changes to finishes, revised structural details Permit status: Completed | Permit id: 17rev-00077 | |||||
SCORE 99 12000-03094: revised electrical at (2) hall offices on 2nd floor. Date: December 28, 2012 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 12rev-00722 | |||||
SCORE 99 Remodel ~352 sf on 2nd floor for stanford offices. Adding (2) skylights over remodeled area. Date: December 19, 2012 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 12000-03094 | |||||
SCORE 99 12-2221: revision includes disabling all mechanized internal roll up doors in the up position. No modifications to fire alarm system . Date: October 19, 2012 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 12rev-00571 | |||||
SCORE 99 Stanford university, add wall at lobby area. Date: September 7, 2012 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 12000-02221 | |||||
SCORE 99 Site improvements for additional parking stalls. Retaining wall. Date: July 19, 2012 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 12000-01737 | |||||
SCORE 72 Commercial evse: install one category ii electric vehicle supply equipment Date: April 3, 2012 Contractor: Redwood City Electric Permit status: Permit issued | Permit id: 12000-00740 | |||||
Stanford university, lbre: ti to the cafe, scope of work includes new lighting, new oven, replace coffee machine. All hoods existing to remain. [deh #sr0838162] Date: April 2, 2012 Permit status: Permit issued | Permit id: 12000-00735 | |||||
SCORE 86 Cafe area; includes additional drain line for to exisitng floor sink. Date: March 9, 2012 Contractor: Castro Plumbing Services Permit status: Permit issued | Permit id: 12000-00541 | |||||
SCORE 99 11-2244 addition of wall mounted fan coil unit with condensing pump at idf room (240) small unit added to roof. Date: February 23, 2012 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 12rev-00107 | |||||
SCORE 86 Commercial boiler replacement in same location. Date: July 10, 2013 Contractor: Grodonprill, Inc Permit status: Permit issued | Permit id: 13000-01803 | |||||
SCORE 100 16-3002: revised plans include clarification work required accessible field review. Date: February 17, 2017 Contractor: Devcon Construction Incorporated Permit status: Permit issued | Permit id: 17rev-00097 | |||||
SCORE 100 Demo 14 x 31 concrete wall and footing to establish property line between 31 and 3170 Permit status: Permit issued | Permit id: 15000-01102 | |||||
31 and 31 porter share utilities. Remove, abandon, and install new water, sewer, and gas services to separate out the systems serving each building. Scope of work includes adding a new fire hydrant. Date: April 28, 2015 Value: $100,000 Permit status: In plan check | Permit id: 15000-01042 | |||||
SCORE 96 Commercial ballasted pv system (297 kw) Permit status: In plan check | Permit id: 17000-00644 | |||||
SCORE 100 Remove existing domestic water heater, tank and pump in mechanical yard and install new skip mounted package dhw system on concrete pad Permit status: Permit issued | Permit id: 15000-01878 | |||||
SCORE 100 15000-02754: revision to inlcude roof screening change, entrance door signage, shower updates in all-gender bathroom, bridge soffit ext courtyard, gutter and fascia modification, updated north and south canopy gutter, updates to dimension of stairways 2,3,5 (n) location for electrical vault, electrical updates to garage fl, 1st, 2nd floor Date: March 16, 2017 Contractor: Devcon Construction Incorporated Permit status: Completed | Permit id: 17rev-00164 | |||||
SCORE 96 17000-00644: revision additional structural info for revised ballasted lay out and electrical drawings. Date: October 2, 2017 Contractor: Sun Light And Power Permit status: Permit issued | Permit id: 17rev-00617 | |||||
SCORE 90 Soil remediation system (120sf) associated electrical, mechanical and plumbing. Water hauled to existing treatment equipment site are. Permit status: In plan check | Permit id: 15000-01646 | |||||
SCORE 100 Existing tenant "stanford" office tenant improvement 64 sf includes new offices and conference room and break room. Permit status: Permit issued | Permit id: 16000-03002 | |||||
SCORE 100 16000-03002: revision includes increasing the depth of parking stalls to meet ada compliance Date: April 7, 2017 Contractor: Devcon Construction Incorporated Permit status: Permit issued | Permit id: 17rev-00211 | |||||
SCORE 90 Reconfiguration of power and data feeds for occupant work stations. Scope of work includes saw cutting slab for in-floor raceway and floor boxes. Permit status: Permit issued | Permit id: 16000-03138 | |||||
SCORE 100 Jazz pharmaceuticals: ti and u&o for office tenant to occupy the entire two story building (95,899 sf). Only exterior work is rooftop equipment. Permit status: Finaled | Permit id: 16000-02616 | |||||
SCORE 100 15000-02754: revision to inlcude updated details to tranformer pad, associated grade,trench drain, and bollard detail. Landscape corrected to match current build set. Paving details. Updated layout of wheels stop and evse details (single to dual head) at parking garage. Door details at restroom core. Soffit and lighting details at ext canopy. Updated shaft wall detail. Electrical updates at vault. Date: May 8, 2017 Contractor: Devcon Construction Incorporated Permit status: Completed | Permit id: 17rev-00274 | |||||
15000-02754: deferred submittal stair 8 structural Date: July 5, 2017 Permit status: Completed | Permit id: 17rev-00404 | |||||
SCORE 100 New 2-story core and shell commercial building 98,000sf and below grade parking 75,000sf (tenant improvement under separate permit.) Permit status: Permit issued | Permit id: 15000-02754 | |||||
SCORE 100 Install eighteen (18) level 2 evse located in a parking lot. Date: May 23, 2017 Contractor: Devcon Construction Incorporated Permit status: Permit issued | Permit id: 17000-01129 |