Building Permits at 31 44th Street Nw Washington DC


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 31 44th Street Nw Washington DC over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
99
Staging of materials for and construction, excavation and removal of existing lead and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard. Period of occupancy for construction of service line will not exceed 2 days.
Date:  March 29, 2012

Permit type: Excavation; sewer lateral connection to 4" (trench) | Permit status: Cancel/withdrawn | Expiration date: August 31, 2012
2012/03/2909931 44th Street Nw Washington DcCorinthian Contractors Inc
SCORE
99
Refer to approved traffic control plan (tcp) for permitted hours of work; dc water lead replacement contract #1000 - corinthian contractors is the contractor; excavation and removal of existing lead service and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard; attached plans and conditiona are part of this permit
Date:  April 4, 2012

Permit type: Excavation; repair water service lateral | Permit status: Permit expired | Expiration date: September 10, 2012 | Permit id: Pa70973
2012/04/0409931 44th Street Nw Washington DcCorinthian Contractors Inc
SCORE
100
Construction staging area
Date:  July 12, 2012
Contractor: Dcwater

Permit status: Expired | Expiration date: August 10, 2012 | Permit id: Pa10065882
2012/07/12010031 44th Street Nw Washington DcDcwater
SCORE
99
Excavation; repair water service lateral
Date:  July 12, 2012

Permit status: 8 | Expiration date: September 10, 2012 | Permit id: Pa70973
2012/07/1209931 44th Street Nw Washington DcCorinthian Contractors Inc
SCORE
99
Excavation; sewer lateral connection to 4" (trench)

Permit status: 3 | Expiration date: August 31, 2012 | Permit id: 0
09931 44th Street Nw Washington DcCorinthian Contractors Inc
SCORE
100
Staging of materials for and construction, excavation and removal of existing lead and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard. Period of occupancy for construction of service line will not exceed 2 days.
Contractor: Dcwater Ops

Permit status: Cancel/withdrawn | Expiration date: August 31, 2012 | Permit id: 0
010031 44th Street Nw Washington DcDcwater Ops
SCORE
86
Refer to approved traffic control plan (tcp) for permitted hours of work; dc water lead replacement contract #1000 - corinthian contractors is the contractor; excavation and removal of existing lead service and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard; attached plans and conditiona are part of this permit
Date:  July 12, 2012

Permit status: Permit expired | Expiration date: September 10, 2012 | Permit id: Pa70973
2012/07/1208631 44th Street Nw Washington DcDcwater Ops Corinthian Contractor
SCORE
99
Excavation; sewer lateral connection to 4" (trench)

Permit status: 3 | Expiration date: August 31, 2012 | Permit id: 0
09931 44th Street Nw Washington DcCorinthian Contractors Inc
SCORE
96
Steel plate- single location
Date:  July 31, 2012

Permit status: Expired | Expiration date: August 4, 2012 | Permit id: Pa10068085
2012/07/3109631 44th Street Nw Washington DcCapitol Paving Of Dc, Inc
SCORE
100
Staging of materials for and construction, excavation and removal of existing lead and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard. Period of occupancy for construction of service line will not exceed 2 days.
Contractor: Dcwater Ops

Permit status: Cancel/withdrawn | Expiration date: August 31, 2012 | Permit id: 0
010031 44th Street Nw Washington DcDcwater Ops
SCORE
99
Other reserved parking
Date:  September 25, 2017
Contractor: William Callahan

Permit status: Permit expired | Expiration date: October 3, 2017 | Permit id: Pa10465541
2017/09/2509931 44th Street Nw Washington DcWilliam Callahan
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.