SCORE 95 Installation of embedded vehicle sensors along edge of roadway in parking spaces; core cut 5 1/4 dia Date: April 23, 2012 Contractor: Rafael RodriguezPermit type: Right of way | Permit status: Complete | Permit id: Row12-02446 | |||||
SCORE 92 Repair of the citys traffic signal fiber optic system; installing conduit crossing michigan st on t Date: October 21, 2013 Contractor: Christian GustinPermit type: Right of way | Permit status: Issued | Permit id: Row13-05651 | |||||
SCORE 93 Repair of the citys traffic signal fiber optic system; installing conduit crossing michigan st on t Date: October 21, 2013 Contractor: Tina EasonPermit type: Right of way | Permit status: Issued | Permit id: Row13-05651 | |||||
SCORE 96 Mill & overlay asphalt surface on south side of michigan st between alabama st & mass ave for dpw pr Date: November 18, 2013 Contractor: Ronald PopePermit type: Right of way | Permit status: Issued | Permit id: Row13-06108 | |||||
SCORE 89 Mill & overlay asphalt surface on south side of michigan st between alabama st & mass ave for dpw pr Date: November 18, 2013 Contractor: Kevin WerkingPermit type: Right of way | Permit status: Issued | Permit id: Row13-06108 | |||||
SCORE 89 Installation of embedded vehicle sensors along edge of roadway in parking spaces; core cut 5 1/4 dia Date: April 23, 2012 Contractor: Steve BubaloClient: R & L Parking Inc 5 Marott Center | Permit type: Right of way | Permit status: Complete | Permit id: Row12-02446 |