Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Dccr proposes to drill 1 geotechnical/monitoring boring (nebbc-37) at 306 rhode island ave nw. Surface casing anticipated to be left in place. If environmentally impacted soils are encountered, soils will be drummed, characterized and disposed appropriately. Refer to attached mw installation schematic ![]() Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Cancel/withdrawn | Expiration date: March 11, 2014 | |||||
Dccr project proposes to excavate one shallow pit (nebbv-50) for the purpose of utility location in the left most northwest bound lane of florida ave nw, southwest of 306 rhode island ave nw. The pit will be approximately 1 foot in diameter and less than feet deep. The pit will be excavated using soft dig techniques (air knife and vacuum extraction). The work time to complete the excavation will be approximately 3 days and will and will be restricted to 9:30am -3:30pm. The work zone will not impact rush hour traffic as the work zone will be removed at the end of each day. ![]() Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: June 30, 2014 | Permit id: Pa90147 | |||||
Dccr project proposes to excavate one shallow pit (nebbv-51) for the purpose of utility location in the sidewalk southwest of 306 rhode island ave nw. The pit will be approximately 1 foot in diameter and less than feet deep. The pit will be excavated using soft dig techniques (air knife and vacuum extraction). The work time to complete the excavation will be approximately 3 days and will and will be restricted to 7am -7pm. The work zone will not impact rush hour traffic as the work zone will be removed at the end of each day. ![]() Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: June 30, 2014 | Permit id: Pa90148 | |||||
SCORE 91 Dccr project proposes to drill 3 direct push boring nebbd-76e-1, nebbd-76e-2, located south of 306 rhode island ave nw. The dp boring will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals (plus vanadium), pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed. ![]() ![]() Client: Dc Water | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: July 17, 2014 | Permit id: Pa90836 | |||||
Dccr proposes to drill 1 geotechnical/monitoring boring (nebbc-37a) at 306 rhode island ave nw. Surface casing anticipated to be left in place. If environmentally impacted soils are encountered, soils will be drummed, characterized and disposed appropriately. Refer to attached mw installation schematic ![]() Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: July 17, 2014 | Permit id: Pa90841 | |||||
SCORE 91 Dccr project proposes to drill 2 direct push boring nebbd-77e-1, nebbd-77e-2, located at 306 rhode island ave nw. The dp boring will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals (plus vanadium), pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed. ![]() ![]() Client: Dc Water | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: August 3, 2014 | Permit id: Pa91509 | |||||
SCORE 91 Dccr project proposes to drill 2 direct push boring nebbd-79e-1, nebbd-79e-2, located at 306 rhode island ave nw. The dp boring will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals (plus vanadium), pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed. ![]() ![]() Client: Dc Water | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: August 3, 2014 | Permit id: Pa91511 | |||||
To install two monitoring wells in sidewalk of 17 block of 3rd st nw at bp service station 242 ![]() Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single) | Permit status: Issued | Expiration date: August 22, 2016 | Permit id: Pa125739 | |||||
SCORE 100 Dccr proposes to drill 1 geotechnical monitoring boring (nebbc-37) at 306 rhode island ave nw. Surface casing anticipated to be left in place. If environmentally impacted soils are encountered, soils will be drummed, characterized and disposed appropriately. Refer to attached mw installation schematic ![]() ![]() Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Cancel/withdrawn | Expiration date: March 11, 2014 | |||||
SCORE 82 Construction staging area ![]() ![]() Permit status: Expired | Expiration date: February 28, 2014 | Permit id: Pa10127258 | |||||
SCORE 99 Construction staging area ![]() ![]() Permit status: Expired | Expiration date: April 30, 2014 | Permit id: Pa10129374-R1 | |||||
SCORE 86 Construction staging area ![]() ![]() Permit status: Expired | Expiration date: April 5, 2014 | Permit id: Pa10129915 | |||||
SCORE 86 Construction staging area ![]() ![]() Permit status: Expired | Expiration date: March 26, 2014 | Permit id: Pa10129725 | |||||
SCORE 61 Excavation; monitoring well (each addl), excavation; monitoring well (single) ![]() Permit status: 1 | Expiration date: September 2, 2017 | Permit id: 0 | |||||
SCORE 100 Excavation; monitoring well (single) ![]() Permit status: 3 | Expiration date: March 11, 2014 | Permit id: 0 | |||||
SCORE 61 A total of two permanent groundwater monitoring wells in the sidewalk (mw-16 on florida avenue and mw-17 on 3rd street n. W) will be constructed in the public space sidewalk. Construction work at each proposed well location is anticipated to be 8 hours or less. ![]() ![]() Client: Jim Smith | Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single) | Permit status: Approved (pending payment | Expiration date: September 2, 2017 | Permit id: 0 | |||||
SCORE 89 Construction staging area ![]() Permit status: Withdrawn | Expiration date: May 19, 2016 | Permit id: 0 | |||||
SCORE 100 Dccr proposes to drill 1 geotechnical monitoring boring (nebbc-37) at 306 rhode island ave nw. Surface casing anticipated to be left in place. If environmentally impacted soils are encountered, soils will be drummed, characterized and disposed appropriately. Refer to attached mw installation schematic ![]() Permit status: Cancel/withdrawn | Expiration date: March 11, 2014 | Permit id: 0 | |||||
SCORE 86 Dccr project proposes to drill 3 direct push boring nebbd-71e-1, nebbd-71e-2, nebbd-71e-3, located south of 306 rhode island ave nw. The dp boring will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals (plus vanadium), pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed ![]() ![]() Permit status: Permit expired | Expiration date: March 3, 2014 | Permit id: Pa89277 | |||||
SCORE 86 Dccr project proposes to drill 2 direct push boring nebbd-75e-1, nebbd-75e-2, located south of 306 rhode island ave nw. The dp boring will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals (plus vanadium), pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed. ![]() ![]() Permit status: Permit expired | Expiration date: July 17, 2014 | Permit id: Pa90834 | |||||
SCORE 86 Dccr project proposes to drill 3 direct push boring nebbd-76e-1, nebbd-76e-2, located south of 306 rhode island ave nw. The dp boring will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals (plus vanadium), pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed. ![]() ![]() Permit status: Permit expired | Expiration date: July 17, 2014 | Permit id: Pa90836 | |||||
SCORE 86 Dccr project proposes to drill 2 direct push boring nebbd-77e-1, nebbd-77e-2, located at 306 rhode island ave nw. The dp boring will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals (plus vanadium), pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed. ![]() ![]() Permit status: Permit expired | Expiration date: August 3, 2014 | Permit id: Pa91509 | |||||
SCORE 86 Dccr project proposes to drill 2 direct push boring nebbd-79e-1, nebbd-79e-2, located at 306 rhode island ave nw. The dp boring will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals (plus vanadium), pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed. ![]() ![]() Permit status: Permit expired | Expiration date: August 3, 2014 | Permit id: Pa91511 | |||||
SCORE 77 A total of two permanent groundwater monitoring wells in the sidewalk (mw-16 on florida avenue and mw-17 on 3rd street n. W) will be constructed in the public space sidewalk. Construction work at each proposed well location is anticipated to be 8 hours or less. ![]() Permit status: Approved (pending payment | Expiration date: September 2, 2017 | Permit id: 0 | |||||
SCORE 86 Construction staging area ![]() ![]() Permit status: Permit expired | Expiration date: March 19, 2014 | Permit id: Pa10129026 | |||||
SCORE 89 Construction staging area ![]() Permit status: Withdrawn | Expiration date: May 19, 2016 | Permit id: 0 | |||||
SCORE 91 Dccr project proposes to drill 3 direct push boring nebbd-71e-1, nebbd-71e-2, nebbd-71e-3, located south of 306 rhode island ave nw. The dp boring will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals (plus vanadium), pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed ![]() ![]() Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: March 3, 2014 | Permit id: Pa89277 | |||||
SCORE 100 Excavation; monitoring well (single) ![]() Permit status: 3 | Expiration date: March 11, 2014 | Permit id: 0 | |||||
SCORE 56 The abandonment of 3 monitoring wells by grouting wells to surface and the removal of the 8" manhole cover. Fill in the (3) 8" manholes with concrete. Occupancy permit must be obtained before start of construction work. ![]() ![]() Permit type: Excavation; monitoring well (single), excavation; monitoring well (each addl) | Permit status: Permit expired | Expiration date: August 12, 2010 | Permit id: Pa54237 | |||||
SCORE 91 Dccr project proposes to drill 2 direct push boring nebbd-75e-1, nebbd-75e-2, located south of 306 rhode island ave nw. The dp boring will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals (plus vanadium), pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed. ![]() ![]() Client: Dc Water | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: July 17, 2014 | Permit id: Pa90834 | |||||
SCORE 89 To install two monitoring wells in sidewalk of 17 block of 3rd st nw at bp service station 242 ![]() ![]() Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: August 22, 2016 | Permit id: Pa125739 | |||||
SCORE 61 Excavation; monitoring well (each addl), excavation; monitoring well (single) ![]() ![]() Permit status: 8 | Expiration date: September 2, 2017 | Permit id: Pa201097 | |||||
SCORE 89 Construction staging area ![]() Permit status: Withdrawn | Expiration date: May 19, 2016 | Permit id: 0 | |||||
SCORE 100 Dccr project proposes to excavate one shallow pit (nebbv-50) for the purpose of utility location in the left most northwest bound lane of florida ave nw, southwest of 306 rhode island ave nw. The pit will be approximately 1 foot in diameter and less than feet deep. The pit will be excavated using soft dig techniques (air knife and vacuum extraction). The work time to complete the excavation will be approximately 3 days and will and will be restricted to 9:30am -3:30pm. The work zone will not impact rush hour traffic as the work zone will be removed at the end of each day. ![]() ![]() Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: June 30, 2014 | Permit id: Pa90147 | |||||
SCORE 100 Dccr project proposes to excavate one shallow pit (nebbv-51) for the purpose of utility location in the sidewalk southwest of 306 rhode island ave nw. The pit will be approximately 1 foot in diameter and less than feet deep. The pit will be excavated using soft dig techniques (air knife and vacuum extraction). The work time to complete the excavation will be approximately 3 days and will and will be restricted to 7am -7pm. The work zone will not impact rush hour traffic as the work zone will be removed at the end of each day. ![]() ![]() Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: June 30, 2014 | Permit id: Pa90148 | |||||
SCORE 100 Dccr proposes to drill 1 geotechnical monitoring boring (nebbc-37) at 306 rhode island ave nw. Surface casing anticipated to be left in place. If environmentally impacted soils are encountered, soils will be drummed, characterized and disposed appropriately. Refer to attached mw installation schematic ![]() Permit status: Cancel/withdrawn | Expiration date: March 11, 2014 | Permit id: 0 | |||||
SCORE 100 Dccr proposes to drill 1 geotechnical monitoring boring (nebbc-37a) at 306 rhode island ave nw. Surface casing anticipated to be left in place. If environmentally impacted soils are encountered, soils will be drummed, characterized and disposed appropriately. Refer to attached mw installation schematic ![]() ![]() Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: July 17, 2014 | Permit id: Pa90841 | |||||
SCORE 77 A total of two permanent groundwater monitoring wells in the sidewalk (mw-16 on florida avenue and mw-17 on 3rd street n. W) will be constructed in the public space sidewalk. Construction work at each proposed well location is anticipated to be 8 hours or less. ![]() ![]() Permit status: Permit expired | Expiration date: September 2, 2017 | Permit id: Pa201097 | |||||
SCORE 86 Construction staging area ![]() ![]() Permit status: Permit expired | Expiration date: January 19, 2014 | Permit id: Pa10123808 | |||||
SCORE 82 Construction staging area ![]() ![]() Permit status: Permit expired | Expiration date: February 28, 2014 | Permit id: Pa10127255 | |||||
SCORE 99 Construction staging area ![]() ![]() Permit status: Permit expired | Expiration date: March 24, 2014 | Permit id: Pa10129374 | |||||
SCORE 89 Construction staging area ![]() Permit status: Withdrawn | Expiration date: May 19, 2016 | Permit id: 0 | |||||
SCORE 77 Construction staging area ![]() ![]() Permit status: Permit expired | Expiration date: August 1, 2017 | Permit id: Pa10377122 |