Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Pressman deck Date: February 27, 2006 Permit status: Closed | Permit id: 05-06146 | |||||
SCORE 56 Pressman deck Client: Pressman Deck | Permit type: Res: accessory structure | Permit status: Closed | Current use: Residential | Permit id: 05-06146 | Parcel: 14292 | |||||
SCORE 100 Pressman deck Client: Pressman Deck | Permit type: Res: accessory structure | Permit status: Closed | Current use: Residential | Permit id: 05-06146 | Parcel: 14292 | |||||
Residential deck for pressman;scc; activated electrical to ebp electric per walk in;scc; flood zone search determines outside of fema;scc; building comments: refer to the plan review comments attached to the approved drawings for important information or corrections for compliance with the building code. The approved plans and review comments are required to be kept on the jobsite for viewing by the city inspectors. The building permit is required to be posted on the job site at all times during the project. The permit shall be in a weathertight location or container accessible to the city inspectors during their inspections. Note!!! - the inspector will turn down an inspection if the permit, approved plans, and plan review comments are not on the jobsite. Footing inspection required: footing inspection is to be made by the building inspector after the trenches are excavated, all necessary forms are in place and braced, and Permit type: Res: accessory structure | Permit status: Closed | Permit id: 05-06146 | Parcel: 14292 | |||||
Pressman deck Date: February 27, 2006 Value: $28,800 Permit type: Residential | Permit status: Closed | Permit id: 05-06146 | |||||
Residential deck for pressman;scc; activated electrical to ebp electric per walk in;scc; flood zone search determines outside of fema;scc; building comments: refer to the plan review comments attached to the approved drawings for important information or corrections for compliance with the building code. The approved plans and review comments are required to be kept on the jobsite for viewing by the city inspectors. The building permit is required to be posted on the job site at all times during the project. The permit shall be in a weathertight location or container accessible to the city inspectors during their inspections. Note!!! - the inspector will turn down an inspection if the permit, approved plans, and plan review comments are not on the jobsite. Footing inspection required: footing inspection is to be made by the building inspector after the trenches are excavated, all necessary forms are in place and braced, and Date: February 27, 2006 Permit type: Res: accessory structure | Permit status: Closed | Permit id: 05-06146 | Parcel: 14292 |