Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Wo#4116 eip. Drill (1) geotechnical soil boring Date: March 24, 2009 Permit id: 09-0090 | |||||
W. O. 99022 p. M. 30829376 remove deteriorated pole- rebuild with identical equipment. All work within the right-of-way shall be constructed per state and federal accessibility standards. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk, tree or landscape will be repaired to normal condition or better. Date: April 7, 2011 Permit id: 11-0071 | Parcel: 014980003000 | |||||
W. O. 99022 p. M. 41611995 excavate a 14x8 bell hole to expose pg&e transmission pipeline for inspection. Date: June 21, 2012 Permit id: 12-0159 | Parcel: 014980003000 | |||||
SCORE 100 W. O. 99022 p. M. 41611995 excavate a 14x8 bell hole to expose pg&e transmission pipeline for inspection. Date: September 7, 2012 Contractor: Pg And E Permit id: 12-0237 | Parcel: 014980003000 |