ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 78 As a part of this task, we are planning to drill two soil test borings, using hollow stem augers of abou eight inches is diameter, the boring will be extended to a maximum depth of 26 feet below existing grade. Spt samples will be obtained at selected depth intervals. The borehole will be backfilled with a 60: bentonite:cement mix upon completion of sampling, on the same day of drilling. The investigation derived waste (idw) will stored in 55 gallon drums and will be tested and disposed off the by a licensed waste hauler. Drilling will take place between 2nd st nw and adam st nw, as per site plans, work plans report, dc well construction application, dc well schematic form, for district of columbia water and sewer authority. All drilling will be done under ddoe/wqd regulation. Date: December 4, 2013 Contractor: Findling Inc Findling IncPermit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: March 27, 2014 | Permit id: Pa89479 | |||||
SCORE 100 Repair valve 6x6 cut in roadway (asphalt w/concrete base) Date: April 4, 2011 Contractor: Dcwater OpsPermit type: Excavation; valves (excavation) | Permit status: Permit expired | Expiration date: September 30, 2011 | Permit id: Pa61214 | |||||
SCORE 89 As a part of this task, we are planning to drill two soil test borings, using hollow stem augers of abou eight inches is diameter, the boring will be extended to a maximum depth of 26 feet below existing grade. Spt samples will be obtained at selected depth intervals. The borehole will be backfilled with a 60: bentonite:cement mix upon completion of sampling, on the same day of drilling. The investigation derived waste (idw) will stored in 55 gallon drums and will be tested and disposed off the by a licensed waste hauler. Drilling will take place between 2nd st nw and adam st nw, as per site plans, work plans report, dc well construction application, dc well schematic form, for district of columbia water and sewer authority. All drilling will be done under ddoe wqd regulation. Date: February 11, 2014 Contractor: Findling, Inc. Findling, IncPermit status: Permit expired | Expiration date: March 27, 2014 | Permit id: Pa89479 | |||||
SCORE 73 As a part of this task, we are planning to drill two soil test borings, using hollow stem augers of abou eight inches is diameter, the boring will be extended to a maximum depth of 26 feet below existing grade. Spt samples will be obtained at selected depth intervals. The borehole will be backfilled with a 60: bentonite:cement mix upon completion of sampling, on the same day of drilling. The investigation derived waste (idw) will stored in 55 gallon drums and will be tested and disposed off the by a licensed waste hauler. Drilling will take place between 2nd st nw and adam st nw, as per site plans, work plans report, dc well construction application, dc well schematic form, for district of columbia water and sewer authority. All drilling will be done under ddoe wqd regulation. Date: December 4, 2013 Contractor: Findling, Inc Findling, IncClient: District Of Columbia Water & Sewer A. District Of Columbia Water & Sewer A. | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: March 27, 2014 | Permit id: Pa89479 | |||||
SCORE 100 Repair valve 6x6 cut in roadway (asphalt w concrete base) Date: April 4, 2011 Contractor: DcwaterPermit type: Excavation; valves (excavation) | Permit status: Permit expired | Expiration date: September 30, 2011 | Permit id: Pa61214 |