Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Roof mounted solar (27 panels,6. 075 kw) Applicant: Verengo (huaracha,Chris) | Permit status: Finaled | Completion date: August 26, 2010 | Permit id: 1008180021 | |||||
SCORE 96 Replace front door (610"h x 3w),same size. Replace (6) windows (same size & location) @ entry,kitchen, bedrms,liv rm,and bathroom. Dual-glazed,1 side tempered. Applicant: Floyd Joshua | Permit status: Finaled | Completion date: September 26, 2013 | Permit id: 1308140084 | |||||
SCORE 95 Electrical for roof pv system & upgrade panel to 200amp Date: August 18, 2010 Contractor: Verengo Inc Applicant: Verengo (huaracha,Chris) | Permit status: Finaled | Completion date: August 26, 2010 | Permit id: 1008180011 | |||||
SCORE 92 Mech to replace (1) ac unit and furnace - same location Date: October 24, 2013 Contractor: Airstream Heating And Air Applicant: Nielson Krys | Permit status: Permisud | Permit id: 1310240030 |