ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 95 Hvac change out - package system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: December 17, 2015 Contractor: Dads Heating And Air Conditioning IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: December 30, 2015 | Permit id: Pds2015-Resalt- | |||||
Misc electrical for one amp circuit for existing church Date: July 20, 2017Permit type: Addn | Permit status: Completed | Completion date: October 6, 2017 | Permit id: Pds2017-Comalt- | |||||
SCORE 68 40 sf re-roof for kingdom hall of jehovahs witnesses if a re-roof project is proposed, the following specifications apply. Existing roofing material asphalt shingles proposed roofing material asphalt shingles manufacturer owens corning brand and model trudefinition duration color (if cool roof required) mountainside, crrc#0890-0016 built-up roofing assembly system number per attached listing report (if applicable) n a specific exemption from cool roof requirements (if applicable) no required building inspector field verification (if applicable) yes replace roof sheathing as required note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: October 20, 2017 Contractor: J D T Development IncPermit type: Addn | Permit status: Completed | Completion date: December 7, 2017 | Permit id: Pds2017-Comalt- | |||||
Final Date: December 28, 2015Permit status: Pass | Permit id: Pds2015-Resalt- |