Building Permits at 2882 N Harvard St Allston MA


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 2882 N Harvard St Allston MA over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
69
High shingle roof: 1. Rip and dispose of shingle roofs down to sheathing. 2. Install ice and water shield on entire roof. 3. Install a new 3 tab 30 year shingle roof. 4. Remove and install new aluminum gutters tying into existing downspouts. 5. Install new white aluminum drip edge and rake edge around t
Date:  June 20, 2012
Value:   $42,575

Client: Harvard Real Es | Permit type: Roofing | Current use: 1-2fam | Permit id: Sf151819 | Parcel: 2147483647
2012/06/204257569288-290 N Harvard St Allston Ma 02134Alfred Slauenwhite Jr
SCORE
69
High shingle roof: 1. Rip and dispose of shingle roofs down to sheathing. 2. Install ice and water shield on entire roof. 3. Install a new 3 tab year shingle roof. 4. Remove and install new aluminum gutters tying into existing downspouts. 5. Install new white aluminum drip edge and rake edge around the perimeter of the roof. 6. Fabricate and install new cooper step flashing aprons and cap flashing at the chimney. 7. Flash one stack penetration with metal sleeve. Three entry roofs: 1. Rip and dispose of existing epdm membrane. 2. Install new high density polyisocyanurate insulation. 3. Install new fully adhered mil carlisle epdm membrane. 4. Install new white aluminum drip edge at back entry roof perimeters. 5. Remove and install new 5 white aluminum gutter tying into existing downspouts at front entry roof. 6. Flash wall with epdm and rework wood shingles as necessary.
Date:  June 20, 2012
Value:   $42,575

Client: City Of Boston | Permit type: Short form bldg permit | Expiration date: December 20, 2012 | Current use: 1-2fam | Permit id: Sf151819 | Parcel: 2200350010
2012/06/204257569288 2 N Harvard St Allston MaAlfred Slauenwhite Jr
SCORE
69
High shingle roof: 1. Rip and dispose of shingle roofs down to sheathing. 2. Install ice and water shield on entire roof. 3. Install a new 3 tab year shingle roof. 4. Remove and install new aluminum gutters tying into existing downspouts. 5. Install new white aluminum drip edge and rake edge around the perimeter of the roof. 6. Fabricate and install new cooper step flashing aprons and cap flashing at the chimney. 7. Flash one stack penetration with metal sleeve. Three entry roofs: 1. Rip and dispose of existing epdm membrane. 2. Install new high density polyisocyanurate insulation. 3. Install new fully adhered mil carlisle epdm membrane. 4. Install new white aluminum drip edge at back entry roof perimeters. 5. Remove and install new 5 white aluminum gutter tying into existing downspouts at front entry roof. 6. Flash wall with epdm and rework wood shingles as necessary.
Date:  June 20, 2012
Value:   $42,575

Client: City Of Boston Library Dept | Permit type: Roofing | Permit status: Expired | Current use: 1-2fam | Permit id: Sf151819 | Parcel: 2200350010
2012/06/2042575692882 N Harvard St Allston Ma 02134Alfred Slauenwhite Jr
SCORE
69
High shingle roof: 1. Rip and dispose of shingle roofs down to sheathing. 2. Install ice and water shield on entire roof. 3. Install a new 3 tab year shingle roof. 4. Remove and install new aluminum gutters tying into existing downspouts. 5. Install new white aluminum drip edge and rake edge around the perimeter of the roof. 6. Fabricate and install new cooper step flashing aprons and cap flashing at the chimney. 7. Flash one stack penetration with metal sleeve. Three entry roofs: 1. Rip and dispose of existing epdm membrane. 2. Install new high density polyisocyanurate insulation. 3. Install new fully adhered mil carlisle epdm membrane. 4. Install new white aluminum drip edge at back entry roof perimeters. 5. Remove and install new 5 white aluminum gutter tying into existing downspouts at front entry roof. 6. Flash wall with epdm and rework wood shingles as necessary.
Date:  June 20, 2012
Value:   $42,575

Client: City Of Boston Library Dept | Permit type: Short form bldg permit | Expiration date: December 20, 2012 | Current use: 1-2fam | Permit id: Sf151819 | Parcel: 2200350010
2012/06/2042575692882 N Harvard St Allston MaAlfred Slauenwhite Jr
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.