Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Replacement forced air furnace Date: January 9, 2006 Contractor: Precision Plumbing And Heating Inc Client: Zuhair Fayez | Applicant: Precision Plumbing & Heating Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: January 31, 2006 | Current use: Single family d | |||||
SCORE 95 Replacement forced air furnace Client: Zuhair Fayez | Permit type: Mechanical | Permit status: Cmp | Completion date: January 31, 2006 | Current use: Single family detached dwelling, existin | Permit id: Pmt2006-20017 | |||||
SCORE 95 Building q-overlay class a single component liquid applied silicone coating over existing epdm deck material, on a pitch represented as 1 4inch per foot, to be installed per manufacturerfoots specs. Scope of work to include removal and replacement of siding associated with flashing repair replacement. Date: May 5, 2015 Contractor: Van Matre Construction Llc Client: Comm United | Applicant: Van Matre Construction Llc | Permit type: Roofing | Permit status: Iss | Current use: Townhomes, exis | |||||
SCORE 95 Building q-overlay class a single component liquid applied silicone coating over existing epdm deck material, on a pitch represented as 1 4inch per foot, to be installed per manufacturerfoots specs. Scope of work to include removal and replacement of siding associated with flashing repair replacement. Client: Comm United | Permit type: Roofing | Permit status: Cmp | Completion date: February 29, 2016 | Current use: Townhomes, existing | Permit id: Pmt2015-01668 |