Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Replacement comfort cooling Date: May 30, 2013 Contractor: Precision Plumbing And Heating Inc Client: Hussein Fayez | Applicant: Precision Plumbing & Heating Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: June 20, 2013 | Current use: Single family d | |||||
SCORE 95 Building q-overlay class a single component liquid applied silicone coating over existing epdm deck material, on a pitch represented as 1 4inch per foot, to be installed per manufacturerfoots specs. Scope of work to include removal and replacement of siding associated with flashing repair replacement. Date: May 5, 2015 Contractor: Jim Black Construction Inc Client: Hussein Fayez | Applicant: Jim Black Construction, Inc | Permit type: Roofing | Permit status: Iss | Current use: Single family a | |||||
SCORE 95 Replacement comfort cooling Client: Hussein Fayez | Permit type: Mechanical | Permit status: Cmp | Completion date: June 20, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-20179 | |||||
SCORE 99 Building q-overlay class a single component liquid applied silicone coating over existing epdm deck material, on a pitch represented as 1 4inch per foot, to be installed per manufacturerfoots specs. Scope of work to include removal and replacement of siding associated with flashing repair replacement. Client: Hussein Fayez | Permit type: Roofing | Permit status: Cmp | Completion date: February 29, 2016 | Current use: Single family attached dwelling, existin | Permit id: Pmt2015-01662 |