Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Cooke new mh Date: May 30, 2012 Permit status: Closed | Permit id: 12-02618 | |||||
SCORE 99 April 6, 2009 10:17:48 am heatherr. Reconnect electrical to heat pump change out via fax. Call redacted phone number for inspection. Date: June 3, 2009 Contractor: Atlantic South East Electric I Client: Brown, Thomas - Gurich, B | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-01541 | Parcel: 1704088 | |||||
SCORE 100 Cooke new mh Client: Cooke New Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-02618 | Parcel: 1704088 | |||||
SCORE 96 Cooke new mh Client: Cooke New Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-02618 | Parcel: 1704088 | |||||
SCORE 100 Cooke new mh Client: Cooke New Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-02618 | Parcel: 1704088 | |||||
SCORE 99 Cooke new mh Client: Cooke New Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-02618 | Parcel: 1704088 | |||||
May 14, 2012 3:17:26 pm kneel. Cooke - new mh to lot. Location: brevard rd to fremont.; may 30, 2012 1:47: pm kneel. Cooke - new mh to lot.; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hook-ups. It is recommended that water lines be insulated with heat tape. Permit type: Permits - historical | Permit status: Closed | Permit id: 12-02618 | Parcel: 1704088 | |||||
Cooke new mh Date: May 30, 2012 Value: $7,000 Permit type: Historical | Permit status: Closed | Permit id: 12-02618 | |||||
SCORE 100 February 19, 2009 4:34:03 pm kneel. Installation of new heat pump and air handler. For inspections call redacted phone number. Date: September 1, 2009 Contractor: First Quality Air Dba Quality Client: Gunich Bonnie | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-00851 | Parcel: 1704088 | |||||
May 14, 2012 3:17:26 pm kneel. Cooke - new mh to lot. Location: brevard rd to fremont.; may 30, 2012 1:47: pm kneel. Cooke - new mh to lot.; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hook-ups. It is recommended that water lines be insulated with heat tape. Date: May 30, 2012 Permit type: Permits - historical | Permit status: Closed | Permit id: 12-02618 | Parcel: 1704088 |