ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 Install and maintain sign in city row. "signal ahead" Date: March 27, 2003 Contractor: City Of SacramentoPermit id: 03-0318 | |||||
Wo#1409 widen pedestrian lane at tower bridge. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Date: December 6, 2006Permit id: 06-0905 | |||||
Cip project, w. O. 152 tower bridge gateway modification project, west phase. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired Date: April 4, 2007Permit id: 07-0467 | |||||
Wo#152 tower brige gtwy modifcation -toby w (proj mgr). Pg&e pm#30548110. Install transformer, pole riser, steeping, underground srvc, conductor & splice box @ delta ln. Provide connection @ existing pg&e splice box on w. Cap ave. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Date: August 28, 2007Permit id: 07-0788 |