| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 95 200a panel change Date: January 22, 2016 Contractor: Sme Inc Of SeattlePermit type: Electrical | Permit status: Permit closed | Completion date: February 5, 2016 | Expiration date: January 21, 2017 | Current use: Single family / duplex | Permit id: 6515130 | |||||
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 5. 88kw pv system on roof Date: January 19, 2016 Contractor: Sme Inc Of SeattlePermit type: Electrical | Permit status: Permit closed | Completion date: February 5, 2016 | Expiration date: January 18, 2017 | Current use: Single family / duplex | Permit id: 6514344 |