Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
New construction of a temporary salt facility related to the dc soccer stadium project owed by dpw managed through dgs. District owed project and site. Date: December 2, 2015 Value: $133 Client: Dc Department Of General Services Dgs | Permit type: Excavation; manhole | |||||
SCORE 100 Replacement of 12 valve was done in sidewalk 6. 5x6) treespace 10x8) Date: April 17, 2012 Contractor: Dcwater Ops Permit type: Excavation; valves (excavation) | Permit status: Denied | Expiration date: October 16, 2012 | |||||
SCORE 100 New construction of a temporary salt facility related to the dc soccer stadium project owed by dpw managed through dgs. District owed project and site. No work in roadways or sidewalks. Date: December 2, 2015 Contractor: Ian Swain Client: Dc Department Of General Services Dgs | Permit type: Excavation; manhole installation, landscaping; tree planting, excavation; sewer lateral connection to 4" (trench) | Permit status: Assigned | Expiration date: August 31, 2016 | |||||
This dc dpw salt storage facility is under construction and nearing completion. The existing southern driveway entrance has been found to be inadequate and must be modified to give arriving trucks more room to maneuver when entering the site. This permit application is to install a new temporary asphalt driveway adjacent to the existing driveway. The existing driveway will remain for the time being but be blocked. A permanent driveway solution will be permitted separately in the near future. Date: November 3, 2016 Permit type: Paving; driveway(s) new- commercial | Permit status: Resubmitted | Expiration date: January 31, 2017 | |||||
SCORE 100 Replacement of 12 valve was done in sidewalk 6. 5x6) treespace 10x8) Date: April 17, 2012 Contractor: Dcwater Permit type: Excavation; valves (excavation) | Permit status: Denied | Expiration date: October 16, 2012 | |||||
SCORE 86 This dc dpw salt storage facility is under construction and nearing completion. The existing southern driveway entrance has been found to be inadequate and must be modified to give arriving trucks more room to maneuver when entering the site. This permit application is to install a new temporary asphalt driveway adjacent to the existing driveway. The existing driveway will remain for the time being but be blocked. A permanent driveway solution will be permitted separately in the near future. Date: November 3, 2016 Contractor: Dc Department Of General Services Permit type: Paving; driveway(s) new- commercial | Permit status: Issued | Expiration date: January 31, 2017 | Permit id: Pa186105 | |||||
SCORE 100 Construction staging area Contractor: Dcwater Permit status: Rejected | Expiration date: June 20, 2012 | Permit id: 0 | |||||
SCORE 100 Excavation; manhole installation, landscaping; tree planting, excavation; sewer lateral connection to 4" (trench) Contractor: Ian Swain Permit status: 10 | Expiration date: August 31, 2016 | Permit id: 0 | |||||
SCORE 86 Paving; driveway(s) new- commercial Date: December 27, 2016 Contractor: Dc Department Of General Services Permit status: 8 | Expiration date: January 31, 2017 | Permit id: Pa186105 | |||||
SCORE 95 Excavation; electric connection (trench) Date: November 16, 2016 Contractor: Pepco Holdings Inc Permit status: 8 | Expiration date: January 27, 2017 | Permit id: Pa185888 | |||||
SCORE 100 Excavation; valves (excavation) Contractor: Dcwater Permit status: 2 | Expiration date: October 16, 2012 | Permit id: 0 | |||||
SCORE 100 Replacement of 12 valve was done in sidewalk 6. 5x6) treespace 10x8) Contractor: Dcwater Ops Permit status: Denied | Expiration date: October 16, 2012 | Permit id: 0 | |||||
SCORE 100 New construction of a temporary salt facility related to the dc soccer stadium project owed by dpw managed through dgs. District owed project and site. No work in roadways or sidewalks. Contractor: Ian Swain Permit status: Revise and resubmit | Expiration date: August 31, 2016 | Permit id: 0 | |||||
SCORE 95 Connect 27 south capitol st se w/ug service by building 89 ft of service conduit and misc equipment on sidewalk of 27 south capitol st se, as indicated on attached prints. Wr# 3497472 - jwhite - dac Date: October 31, 2016 Contractor: Pepco Holdings Inc Permit type: Excavation; electric connection (trench) | Permit status: Permit expired | Expiration date: January 27, 2017 | Permit id: Pa185888 | |||||
SCORE 100 Excavation; valves (excavation) Contractor: Dcwater Permit status: 2 | Expiration date: October 16, 2012 | Permit id: 0 | |||||
SCORE 100 Excavation; manhole installation, landscaping; tree planting, excavation; sewer lateral connection to 4" (trench) Contractor: Ian Swain Permit status: 10 | Expiration date: August 31, 2016 | Permit id: 0 | |||||
SCORE 100 Construction staging area Contractor: Dcwater Permit status: Rejected | Expiration date: June 20, 2012 | Permit id: 0 | |||||
SCORE 100 Replacement of 12 valve was done in sidewalk 6. 5x6) treespace 10x8) Contractor: Dcwater Ops Permit status: Denied | Expiration date: October 16, 2012 | Permit id: 0 | |||||
SCORE 100 New construction of a temporary salt facility related to the dc soccer stadium project owed by dpw managed through dgs. District owed project and site. No work in roadways or sidewalks. Contractor: Ian Swain Permit status: Revise and resubmit | Expiration date: August 31, 2016 | Permit id: 0 | |||||
SCORE 100 Construction staging area Date: May 16, 2016 Contractor: Ian Swain Permit status: Permit expired | Expiration date: September 30, 2016 | Permit id: Pa10250510 | |||||
SCORE 100 Construction staging area Date: November 29, 2016 Contractor: Greg Johnson Permit status: Permit expired | Expiration date: December 29, 2016 | Permit id: Pa10357000 |