ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Date: March 2, 2016Client: Harrison Inc | Permit status: Active | Permit id: 673546 | |||||
Plumbing permit Date: March 2, 2016Client: Harrison Inc | Permit status: Completed | Permit id: 673669 | |||||
Alteration permit Date: March 1, 2016Client: Harrison Inc | Permit status: Completed | Permit id: 673164 | |||||
Mechanical permit Date: February 24, 2016Client: Harrison Inc | Permit status: Completed | Permit id: 672056 | |||||
Alteration permit Date: October 15, 2015Client: Harrison Inc | Permit status: Completed | Permit id: 645402 | |||||
Mechanical permit Date: February 24, 2016Client: Harrison Inc | Permit status: Completed | Permit id: 672056 | |||||
Alteration permit Date: October 15, 2015Client: Harrison Inc | Permit status: Completed | Permit id: 645402 | |||||
Plumbing permit Date: March 2, 2016Client: Harrison Inc | Permit status: Completed | Permit id: 673669 | |||||
Electrical permit Date: March 2, 2016Client: Harrison Inc | Permit status: Active | Permit id: 673546 | |||||
Alteration permit Date: March 1, 2016Client: Harrison Inc | Permit status: Completed | Permit id: 673164 | |||||
SCORE 89 Ez exterior wall coverings (stucco)- for the application of exterior wall coverings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: October 15, 2015 Contractor: Interstate MasonryClient: Harrison Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: February 26, 2016 | Permit id: 645402 | |||||
SCORE 89 Installing new wiring throughout new 200amp service complete with meter, panel and grounding new switches outlets gfci light fixtures smokes co detectors as per 2008 nec (north district) Date: June 30, 2017 Contractor: Green Team Electric IncPermit type: Electrical permit | Permit status: Active | Completion date: June 30, 2017 | Permit id: 796598 | |||||
SCORE 100 Ez interior alterations. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated january 2011. Deviation from the standard will result in revocation of this permit and imposition of further penalties. Licensed contractor to be listed on permit. Separate permits required for plumbing, electric and hvac. Call inspector at district office at least 24 hours prior to start Date: March 1, 2016 Contractor: Joseph Loonstyn Roof Cont LlcClient: Harrison Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: September 26, 2016 | Permit id: 673164 | |||||
SCORE 100 Install (1) hvac system with ductwork. (sfd) Date: February 24, 2016 Contractor: Stonewall Contracting LlcClient: Harrison Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 26, 2016 | Permit id: 672056 | |||||
SCORE 96 Erection of a three story structure with cellar; 2nd and 3rd floor bays; roof deck over 3-story portion and a stair pent to access roof deck for use as sfd. Date: April 20, 2017 Contractor: Bt Pavers IncClient: Hibarrondo Peoro A Charon | Permit type: New construction permit | Permit status: Completed | Completion date: November 27, 2017 | Permit id: 774577 | |||||
SCORE 89 Installation of nfpa 13d fire sprinkler system with a 1" combined service and 1" water meter as per plan. Date: June 22, 2017 Contractor: Aqueduct Fire ProtectionClient: Hibarrondo Peoro A Charon | Permit type: Suppression permit | Permit status: Completed | Completion date: November 27, 2017 | Permit id: 784804 | |||||
SCORE 100 2 complete hvac systmems, 60k btu furnace,at 90%, 2 1 2 ac, with all related ductwork. Date: June 16, 2017 Contractor: Ss Mechanicals HvacClient: Hibarrondo Peoro A Charon | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 27, 2017 | Permit id: 792555 | |||||
SCORE 89 Installing new wiring throughout new 200amp service complete with meter, panel and grounding new switches outlets gfci light fixtures smokes co detectors phone,& cable as per 2008 nec (west district) Date: July 24, 2017 Contractor: Green Team Electric IncClient: Hibarrondo Peoro A Charon | Permit type: Electrical permit | Permit status: Completed | Completion date: November 2, 2017 | Permit id: 802238 | |||||
SCORE 100 Replace 100amp panel and install switches, 25 recepts, 15 lights & 6 smokes as per 2008 nec (north district) Date: March 2, 2016 Contractor: Dameon CartyClient: Harrison Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: August 23, 2016 | Permit id: 673546 | |||||
SCORE 100 Install 3 toilets,3 lavs,3 tubs,1 kitchen sink,1 washer 5"lateral,house drain,house trap and 1" combo (sfd)pa20172500013 the installation will comply with the philadelphia plumbing code 2004 "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: September 7, 2017 Contractor: Ferko PlumbingPermit type: Plumbing permit | Permit status: Active | Completion date: October 4, 2017 | Permit id: 814369 | |||||
SCORE 89 For the installation of fire suppression system in accordance with nfpa 2007, standard 13d to include a combined 1-inch diameter service line. Date: August 10, 2017 Contractor: Aqueduct Fire ProtectionPermit type: Suppression permit | Permit status: Active | Completion date: September 21, 2017 | Permit id: 798922 | |||||
SCORE 96 Erection of a three story structure with cellar; 2nd and 3rd floor bays; roof deck over 3-story portion and a stair pent to access roof deck for use as sfd.(size and location as shown on plans) Date: June 6, 2017 Contractor: Bt Pavers IncPermit type: New construction permit | Permit status: Active | Completion date: September 26, 2017 | Permit id: 782909 | |||||
Erection of a three story structure with cellar; 2nd and 3rd floor bays; roof deck over 3-story portion and a stair pent ot access roof deck for use as sfd. Date: June 6, 2017Permit type: Zoning/use permit | Permit status: Completed | Completion date: June 6, 2017 | Permit id: 782901 | |||||
SCORE 100 Install 3 toilets,3 lavs,3 showers,1 kitchen sink,1 washer,5" lateral,house drain,house trap,fai pa20172051091 (sfd)the installation will comply with the philadelphia plumbing code 2004 "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: July 25, 2017 Contractor: Ferko PlumbingClient: Hibarrondo Peoro A Charon | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 27, 2017 | Permit id: 802697 | |||||
SCORE 100 Install (1) hvac system with ductwork. (sfd) Date: August 1, 2017 Contractor: Ss Mechanicals HvacPermit type: Mechanical permit | Permit status: Active | Completion date: September 21, 2017 | Permit id: 804664 | |||||
Erection of a three story structure with cellar; 2nd and 3rd floor bays; roof deck over 3-story portion and a stair pent to access roof deck for use as sfd.(see ap# 774577 for plans) Date: April 20, 2017Client: Hibarrondo Peoro A Charon | Permit type: Zoning/use permit | Permit status: Completed | Completion date: April 20, 2017 | Permit id: 774573 | |||||
SCORE 100 Replace section of main drain in basement, stack, rain leader cesspool, wastelines for tub, water closet, lavy sink & kitchen sink - the installation will compy with the philadephia plubming code 2004 Date: March 2, 2016 Contractor: Plumbing WorksClient: Harrison Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 25, 2016 | Permit id: 673669 |